7 Flood Projects found

River Basin: 410 - Murrumbidgee Tags: Gundagai

Filter Results
  • Flood Project
    Flood study

    Gundagai Flood Scoping Study

    Completed
    Publication date: 01/07/2013
    This scoping study examines the data, time, budget and methodology requirements for managing flood risk within the (then) Gundagai LGA under the NSW Floodplain Risk Management...

  • Flood Project
    Post event flood behaviour reports

    Murrumbidgee River - Flood Modelling 2012

    Completed
    Publication date: 31/01/2012
    The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area is surrounded by seven other LGAs, namely Coolamon and Junee to the...

  • Flood Project
    Flood study

    Murrumbidgee River - Flood Modelling

    Completed
    Publication date: 26/09/2011
    The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area (depicted in Figure 1) is surrounded by seven other LGAs, namely...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Jugiong Floodplain Risk Management Study and Plan

    Completed
    Publication date: 02/08/2011
    Jugiong is located in the Riverina district of western NSW. The centre of town lies on either side of Riverside Drive and is mainly concentrated in higher land near the historic...

  • Flood Project
    Post event flood behaviour reports

    Review of water management during the 2010 flood events in the Tumut River...

    Completed
    Publication date: 01/08/2011
    The Murrumbidgee River rises on the Monaro Plateau. The river initially flows southeast then turns north near Cooma and swings north-northwest through the ACT before entering...

  • Flood Project
    Floodplain Risk Management Study

    Narrandera Floodplain Risk Management Study

    Completed
    Publication date: 30/03/2009
    There is a long history of flooding from the Murrumbidgee River in Narrandera. Serious flooding has been reported since settlement began over 150 years ago. Formal gauging of...

  • Flood Project
    Floodplain Risk Management Plan

    Narrandera Floodplain Risk Management Plan

    Completed
    Publication date: 27/03/2009
    There is a long history of flooding from the Murrumbidgee River in Narrandera. Serious flooding has been reported since settlement began over 150 years ago. Formal gauging of...