111 Flood Projects found

River Basin: 410 - Murrumbidgee

Filter Results
  • Flood Project
    Flood study

    Griffith Flood Study

    Completed
    Publication date: 28/08/2006
    The Main Drain ‘J’ catchment covers an area of nearly 1,000 square kilometres, forming a moderately sized sub-catchment of the Murrumbidgee River Valley. The catchment extends...

  • Flood Project
    Floodplain Risk Management Plan

    Billabong Creek Floodplain Management Plan

    Completed
    Publication date: 01/05/2006
    The Billabong Creek FMP applies to the Billabong Creek floodplain situated between the Murray and Murrumbidgee Rivers in southern New South Wales. The floodplain extends from...

  • Flood Project
    Flood study

    Moulamein Levee Upgrade Flood Study

    Completed
    Publication date: 16/04/2006
    Moulamein is located in south-western New South Wales about 100 kilometres west of Deniliquin. The town is situated at the confluence of the Edward River and Billabong Creek...

  • Flood Project
    Detailed Design

    Dudauman Creek Levee - Stockinbingal Final Design Report

    Completed
    Publication date: 01/06/2005
    Cootamundra Shire Council (CSC) commissioned Cardno Willing (NSW) Pty Ltd (CW) to investigate and design levee banks at Dudauman Creek, Stockinbingal. The design is to be...

  • Flood Project
    Visual Levee Audits

    Jindalee Creek Levee, Cootamundra

    Completed
    Publication date: 01/06/2005
    Cootamundra Shire Council commissioned Cardno Willing (NSW) Pty Ltd to investigate and design levee banks at Jindalee Creek, Cootamundra. The design was undertaken in two...

  • Flood Project
    Floodplain Risk Management Study

    Billabong Creek Floodplain Management Study (Phase B Report)

    Completed
    Publication date: 01/06/2004
    Billabong Creek is situated between the Murray and Murrumbidgee Rivers in southern New South Wales. The study area, shown on Figure 1, covers that portion of the Billabong Creek...

  • Flood Project
    Visual Levee Audits

    Balranald and Euston Flood Protection Works

    Completed
    Publication date: 29/10/2002
    The Balranald Shire Council has engaged SKM to investigate flood protection for the towns of Balranald and Euston. This report presents the key outcomes of the work undertaken...

  • Flood Project
    Flood study

    Lockhart Flood Study

    Completed
    Publication date: 30/04/2002
    The township of Lockhart is located on the banks of Brookong Creek in the south-west of New South Wales, about 65 kilometres west of Wagga Wagga. Brookong Creek runs through the...

  • Flood Project
    Floodplain Risk Management Study

    Cootamundra Floodplain Management Study

    Completed
    Publication date: 01/06/2001
    The study area lies within the overall catchment of Muttama Creek. The township of Cootamundra is located in the upper reaches of Muttama Creek. Gundagai township is located on...

  • Flood Project
    Guidance, Tools and Resources

    Murrumbidgee Province - Aboriginal Cultural Heritage Study

    Completed
    Publication date: 01/06/2001
    The Murrumbidgee Province of the Riverine Plain is three million hectares in extent, covering an area the size of Belgium. It is greater in size than the total area of protected...

  • Flood Project
    Floodplain Risk Management Plan

    Cootamundra Floodplain Management Plan

    Completed
    Publication date: 01/06/2001
    The study area lies within the overall catchment of Muttama Creek. It includes the floodplain between Nash's Lane and the Cootamundra Lake site, being the West Jindalee Road....

  • Flood Project
    Flood study

    Narrandera Flood Study - Volume 1 Final Report

    Completed
    Publication date: 06/12/2000
    Narrandera is located on the Murrumbidgee River approximately 460 km west of the headwaters. Narrandera itself is a rural shire of approximately 4,177 square kilometres. The...

  • Flood Project
    Guidance, Tools and Resources

    Cooma Flood Mitigation Works Final Report On Phase 1 and 2 Investigations

    Completed
    Publication date: 01/03/2000
    In 1993-1994 the Snowy Mountains Engineering Corporation (SMEC) in association with the National Capital Planning Authority (NCPA) were engaged by the Cooma-Monaro Shire Council...

  • Flood Project
    Flood study

    Bungendore Flood Study

    Completed
    Publication date: 22/04/1999
    At present a large part of the commercial district of Bungendore is affected by flooding in the 1 in 100 year flood. In severe storms Turallo Creek and its tributaries can...

  • Flood Project
    Guidance, Tools and Resources

    Bredbo & The Bidge - Management Strategies For The Murrumbidgee River & Its...

    Completed
    Publication date: 15/09/1998
    This report examines changes that have occurred in the Murrumbidgee River and its tributaries. Using this information, future directions are evaluated with a view to developing...

  • Flood Project
    Review of Environmental Factors

    Cooma - Review of Environmental Factors for the Flood Mitigation Works

    Completed
    Publication date: 07/05/1998
    Cooma-Monaro Shire Council proposes to undertake flood mitigation works for the town of Cooma. This is in accordance with the Floodplain Management Plan (FPMP) developed from...

  • Flood Project
    Geotech Report on levee

    Cootamundra Lake - Options and Concept Design Study

    Completed
    Publication date: 01/04/1998
    The aim of this study was to examine options for the construction of a lake at the junction of Muttama and Jindalee Creeks upstream of Cootamundra. The lake design was to...

  • Flood Project
    Guidance, Tools and Resources

    Barham Town - Levee Investigation

    Completed
    Publication date: 01/02/1995
    The results of a study into the identification of the most cost-effective and practical option for the protection of the town of Barham from floods are presented in this report....

  • Flood Project
    Guidance, Tools and Resources

    The Rock, Flowerpot Hill Catchment - Coordinated Drainage Study

    Completed
    Publication date: 01/09/1993
    A study has been undertaken of drainage problems within the Flowerpot Hill catchment at The Rock on behalf of the Flowerpot Hill Landcare Group. This report identifies and costs...

  • Flood Project
    Visual Levee Audits

    Audit of Flood Levees for New South Wales - Town of Moulamein

    Completed
    Publication date: 01/11/1992
    The town of Moulamein on the Edward River and Billabong Creek in New South Wales has a population of about 500. It is protected from flooding by two (2) levee systems...