-
Flood ProjectFloodplain Risk Management Plan
Narrandera Floodplain Risk Management Plan
CompletedPublication date: 27/03/2009There is a long history of flooding from the Murrumbidgee River in Narrandera. Serious flooding has been reported since settlement began over 150 years ago. Formal gauging of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Conargo - Floodplain Management Study & Plan - Flood Data Assessment Study...
CompletedPublication date: 01/12/2008Conargo Council intends to prepare a Floodplain Risk Management Study and Plan for the village of Conargo. The overall objectives of the Floodplain Risk Management Study will be...
-
Flood ProjectFlood study
Murrumbidgee River Floodplain: Hay to Maude - Phase A Flood Study and Data Collection
CompletedPublication date: 01/01/2008The specific area of the Murrumbidgee River considered by this study is the reach between 11km upstream of Hay and just downstream of Maude. The Study area covers a total...
-
Flood ProjectVisual Levee Audits
Hay Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/03/2007Hay is located in southwestern NSW, approximately 720 km south west of Sydney. The town is located on the Murrumbidgee River and is protected from flooding by a levee system...
-
Flood ProjectVisual Levee Audits
Moulamein Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/02/2007Moulamein is located in southwestern NSW, approximately 660 km south west of Sydney. The town is located on the Edward River and is protected from flooding by a levee system...
-
Flood ProjectVisual Levee Audits
Barham Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/02/2007Barham is located in southwestern NSW, approximately 805 km south west of Sydney. The town is located on the Murray River and is protected from flooding by a levee system...
-
Flood ProjectVisual Levee Audits
Darlington Point Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/01/2007The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...
-
Flood ProjectFlood study
Griffith Flood Study
CompletedPublication date: 28/08/2006The Main Drain ‘J’ catchment covers an area of nearly 1,000 square kilometres, forming a moderately sized sub-catchment of the Murrumbidgee River Valley. The catchment extends...
-
Flood ProjectFloodplain Risk Management Plan
Billabong Creek Floodplain Management Plan
CompletedPublication date: 01/05/2006The Billabong Creek FMP applies to the Billabong Creek floodplain situated between the Murray and Murrumbidgee Rivers in southern New South Wales. The floodplain extends from...
-
Flood ProjectFlood study
Moulamein Levee Upgrade Flood Study
CompletedPublication date: 16/04/2006Moulamein is located in south-western New South Wales about 100 kilometres west of Deniliquin. The town is situated at the confluence of the Edward River and Billabong Creek...
-
Flood ProjectVisual Levee Audits
Jindalee Creek Levee, Cootamundra
CompletedPublication date: 01/06/2005Cootamundra Shire Council commissioned Cardno Willing (NSW) Pty Ltd to investigate and design levee banks at Jindalee Creek, Cootamundra. The design was undertaken in two...
-
Flood ProjectDetailed Design
Dudauman Creek Levee - Stockinbingal Final Design Report
CompletedPublication date: 01/06/2005Cootamundra Shire Council (CSC) commissioned Cardno Willing (NSW) Pty Ltd (CW) to investigate and design levee banks at Dudauman Creek, Stockinbingal. The design is to be...
-
Flood ProjectFloodplain Risk Management Study
Billabong Creek Floodplain Management Study (Phase B Report)
CompletedPublication date: 01/06/2004Billabong Creek is situated between the Murray and Murrumbidgee Rivers in southern New South Wales. The study area, shown on Figure 1, covers that portion of the Billabong Creek...
-
Flood ProjectVisual Levee Audits
Balranald and Euston Flood Protection Works
CompletedPublication date: 29/10/2002The Balranald Shire Council has engaged SKM to investigate flood protection for the towns of Balranald and Euston. This report presents the key outcomes of the work undertaken...
-
Flood ProjectFloodplain Risk Management Study
Cootamundra Floodplain Management Study
CompletedPublication date: 01/06/2001The study area lies within the overall catchment of Muttama Creek. The township of Cootamundra is located in the upper reaches of Muttama Creek. Gundagai township is located on...
-
Flood ProjectFloodplain Risk Management Plan
Cootamundra Floodplain Management Plan
CompletedPublication date: 01/06/2001The study area lies within the overall catchment of Muttama Creek. It includes the floodplain between Nash's Lane and the Cootamundra Lake site, being the West Jindalee Road....
-
Flood ProjectGuidance, Tools and Resources
Murrumbidgee Province - Aboriginal Cultural Heritage Study
CompletedPublication date: 01/06/2001The Murrumbidgee Province of the Riverine Plain is three million hectares in extent, covering an area the size of Belgium. It is greater in size than the total area of protected...
-
Flood ProjectFlood study
Narrandera Flood Study - Volume 1 Final Report
CompletedPublication date: 06/12/2000Narrandera is located on the Murrumbidgee River approximately 460 km west of the headwaters. Narrandera itself is a rural shire of approximately 4,177 square kilometres. The...
-
Flood ProjectGuidance, Tools and Resources
Cooma Flood Mitigation Works Final Report On Phase 1 and 2 Investigations
CompletedPublication date: 01/03/2000In 1993-1994 the Snowy Mountains Engineering Corporation (SMEC) in association with the National Capital Planning Authority (NCPA) were engaged by the Cooma-Monaro Shire Council...
-
Flood ProjectFlood study
Bungendore Flood Study
CompletedPublication date: 22/04/1999At present a large part of the commercial district of Bungendore is affected by flooding in the 1 in 100 year flood. In severe storms Turallo Creek and its tributaries can...