Flood ProjectFlood Warning Reports
Cootamundra Flood Warning System Review
CompletedPublication date: 15/01/2026This report presents the outcomes of the flood warning system review targeted at identifying actions which can lead to improved flood warning arrangements for Cootamundra. The...
-
Flood ProjectFlood Warning Reports
Captains Flat Total Flood Warning System - Design
CompletedPublication date: 15/12/2025Design report for a Total Flood Warning System (TFWS) for Captains Flat
-
Flood ProjectConcept Design
Lake Albert Flood Mitigation Feasibility Study
CompletedPublication date: 04/12/2025After completion of the Major Overland Flood Flow Study in Wagga, a recommendation to develop flood mitigation options for Lake Albert was adopted by Council. This report looks...
-
Flood ProjectFlood study
Leeton Flood Study Review
CompletedPublication date: 23/10/2025Located about 126 km west of Wagga Wagga in the Riverina region of NSW, the Leeton Shire Council (LSC) area includes several main townships and villages, such as Leeton, Yanco,...
-
Flood ProjectConcept Design
Glenfield Road Drain and Flowerdale Storage Mitigation Works and Feasibility Study
CompletedPublication date: 01/10/2025This report deals with an investigation that was undertaken on behalf of Wagga Wagga City Council to more accurately define the nature of flooding in the Glenfield Road Drain...
-
Flood ProjectFlood study
Coolamon Flood Study
CompletedPublication date: 01/03/2025The objective of the study was to define the nature of the following two types of flooding that are experienced at the township of Coolamon for flood frequencies ranging between...
-
Flood ProjectFloodplain Risk Management Study and Plan
Hay and Maude Flood Study and Flood Risk Management Study and Plan
CompletedPublication date: 01/03/2025Hay Shire Council (Council) commissioned the preparation of a Flood Study and Flood Risk Management Study and Plan for the township of Hay and the village of Maude. The...
-
Flood ProjectLevee Projects
A feasibility study for the flood mitigation Options for North Wagga
CompletedPublication date: 08/05/2024A comparison of three recommendations from the 2018 FRMSP to determine the most appropriate mitigation solution to go forward with for the village of North Wagga
-
Flood ProjectDetailed Design
Barellan Levee
CompletedPublication date: 14/03/2024Detail Design and Design Report for the Barellan Levee which was the Option D alignment in the Barellan Levee Options Feasibility Study (WMS February 2021)
-
Flood ProjectFloodplain Risk Management Study and Plan
Cootamundra Floodplain Risk Management Study and Plan
CompletedPublication date: 15/06/2023Cootamundra Floodplain Risk Management Study and Plan considered and assessed a range of options for the management of existing and future flood risk in Cootamundra. A series of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Federation Villages Floodplain Risk Management Study and Plan
CompletedPublication date: 11/03/2022The Study builds on flood modelling initially developed in the towns of Morundah, Boree Creek, Oaklands, Rand and Urana in the Federation Villages Flood Study (Jacobs, 2017)....
-
Flood ProjectFloodplain Risk Management Study and Plan
Darlington Point Floodplain Risk Management Study and Plan
CompletedPublication date: 27/10/2021Floodplain Risk Management Study and Plan for Darlington Point, which is located on the floodplain of the Murrumbidgee River. The overall goal of the Floodplain Risk Management...
-
Flood ProjectFlood study
Murrumbateman, Bowning, Bookham and Binalong Flood Study – Addendum Report
CompletedPublication date: 21/07/2021The Murrumbateman, Bowning, Bookham and Binalong Flood Study – Addendum Report deals with the development of flood planning constraint category maps for the villages of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Yass Floodplain Risk Management Study & Plan
CompletedPublication date: 01/07/2021Yass Valley Council commissioned the preparation of a Floodplain Risk Management Study and Plan for the township of Yass. The overall objectives of the Yass Floodplain Risk...
-
Flood ProjectFloodplain Risk Management Study and Plan
Tarcutta, Ladysmith and Uranquinty Floodplain Risk Management Studies and Plans
CompletedPublication date: 18/06/2021This report describes the data collection, model update, flood risk assessment and mitigation measures assessment of the Tarcutta, Ladysmith & Uranquinty Floodplain Risk...
-
Flood ProjectFloodplain Risk Management Study and Plan
Wagga Wagga Major Overland Flow Floodplain Risk management Study and Plan
CompletedPublication date: 03/05/2021In this study, a full assessment of the existing flood risk in the catchment has been carried out, including flood hazard across the study area, over floor flooding of...
-
Flood ProjectFlood study
Cootamundra Flood Study
CompletedPublication date: 26/02/2021Cootamundra is located in southern inland NSW approximately 300 km west south west of Sydney in the Cootamundra-Gundagai Regional Council Local Government Area. The study area...
-
Flood ProjectFloodplain Risk Management Study and Plan
Queanbeyan Floodplain Risk Management Study & Plan
CompletedPublication date: 01/12/2020Study Objectives Queanbeyan-Palerang Regional Council (Council__) commissioned the finalisation of the Floodplain Risk Management Study and Plan_ for the parts of the Queanbeyan...
-
Flood ProjectFlood study
MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2020
CompletedPublication date: 25/11/2020The Murrumburrah Flood Study provided information about existing flood risk in the Currawong Creek catchment, which is also known locally as Murrimboola Creek. Flood modelling...
-
Flood ProjectFloodplain Risk Management Study and Plan
Snowy Monaro Regional Council Flood and Floodplain Risk Management Studies -...
CompletedPublication date: 01/11/2020Floodplain Risk Management Study and Plan for Cooma, Bredbo, Michelago and Berridale that followed the Flood Study finalised in 2019. The FRMS&P assessed flood risk in each...