70 Flood Projects found

River Basin: 215 - Shoalhaven Organisations: Shoalhaven City Council

Filter Results
  • Flood Project
    Flood study

    Lower Shoalhaven River Flood Study 2022

    Completed
    Publication date: 09/11/2022
    Shoalhaven City Council engaged Cardno (now Stantec) to assist with the preparation of the Lower Shoalhaven Flood Study. Previous flood information available for the catchment...

  • Flood Project
    Floodplain Risk Management Study

    Tabourie Lake FRMSP - Floodplain Risk Management Study

    Completed
    Publication date: 20/04/2016
    Tabourie Lake is located on the NSW South Coast, south of Ulladulla. Tabourie Lake is fed primarily by Lucy Kings Creek and Munno Creek. These tributaries are the primary source...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Bomaderry Flood Map

    Completed
    Publication date: 01/04/2016
    Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard). Please note that the date of the map is unknown, but the FRMS and FRMP were completed...

  • Flood Project
    Floodplain Risk Management Plan

    Bomaderry Creek Floodplain Risk Management Plan

    Completed
    Publication date: 01/04/2016
    Shoalhaven City Council have commissioned Cardno to undertake a Floodplain Risk Management Study for the Bomaderry Township and its surrounds. Bomaderry Creek is a major...

  • Flood Project
    Floodplain Risk Management Plan

    Kangaroo Valley Floodplain Risk Management Plan

    Completed
    Publication date: 01/04/2016
    The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...

  • Flood Project
    Floodplain Risk Management Study

    Kangaroo Valley Floodplain Risk Management Study

    Completed
    Publication date: 01/04/2016
    The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...

  • Flood Project
    Floodplain Risk Management Study

    Greenwell Point, Shoalhaven Floodplain Management Options Feasibility Study

    Completed
    Publication date: 03/09/2014
    Greenwell Point is a coastal settlement located on the south coast of NSW, approximately 12 km east of Nowra. It is located in the lower floodplain of the Shoalhaven River and...

  • Flood Project
    Flood study

    Broughton Creek Flood Map

    Completed
    Publication date: 14/10/2011
    Broughton Creek 1%AEP (100 year ARI) combined hazard and hydraulic categories; floodway, flood storage and flood fringe.

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Shoalhaven River Floodplain Management Study & Plan - Climate Change Assessment

    Completed
    Publication date: 01/08/2011
    The main objective of this study is to amend the existing Lower Shoalhaven River Floodplain Risk Management Study and Plan to incorporate the predicted impacts of climate...

  • Flood Project
    Flood study

    Kangaroo Valley Flood Study

    Completed
    Publication date: 08/12/2009
    A flood study of Kangaroo River and its floodplains and waterways was undertaken to determine flood behaviour in and around the town of Kangaroo Valley. The study produced...

  • Flood Project
    Guidance, Tools and Resources

    Lower Shoalhaven River Hazard and Hydraulic Categories

    Completed
    Publication date: 01/05/2008
    Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River Entrance Management Plan for Flood Mitigation

    Completed
    Publication date: 01/11/2006
    If the entrance of the Shoalhaven River at Shoalhaven Heads were to remain closed during a flood, water levels would be significantly higher for longer in some parts of the...

  • Flood Project
    Flood study

    Broughton Creek Flood Study

    Completed
    Publication date: 01/06/2006
    Broughton Creek is a tributary of the Shoalhaven River draining the hills of Cambewarra Range and the Shoalhaven floodplain on the northern side of the river. The catchment area...

  • Flood Project
    Flood study

    Kangaroo Valley Flood Study (Final Draft)

    Completed
    Publication date: 01/06/2006
    The Kangaroo River at Kangaroo Valley has a catchment area of approximately 334 square kilometres. The catchment extends approximately 20km north from Hampden Bridge alongside...

  • Flood Project
    Flood study

    Broughton Creek Flood Study (Draft)

    Completed
    Publication date: 01/06/2006
    Broughton Creek is a tributary of the Shoalhaven River draining the hills of Cambewarra Range and the Shoalhaven floodplain on the northern side of the river. The catchment area...

  • Flood Project
    Flood study

    Nowra and Browns Creeks Flood Study

    Completed
    Publication date: 11/03/2005
    Nowra Creek is a tributary of the Shoalhaven River that drains the area to the south-west of the central business district and major residential areas of Nowra. It is an...

  • Flood Project
    Visual Levee Audits

    Terara Levee - Final Design Report

    Completed
    Publication date: 01/03/2005
    In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...

  • Flood Project
    Geotech Report on levee

    Terara Levee Restoration & Upgrade Project - Additional Geotechnical...

    Completed
    Publication date: 01/09/2003
    This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...

  • Flood Project
    Visual Levee Audits

    Terara Levee Audit Final Report

    Completed
    Publication date: 25/03/2002
    Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...

  • Flood Project
    Floodplain Risk Management Study

    Riverview Road Area - Nowra Floodplain Management Study

    Completed
    Publication date: 26/02/2002
    The land on the south bank of the Shoalhaven River downstream of Nowra Bridge has had a history of flooding. This Floodplain Management Study examines flooding issues relating...