316 Flood Projects found

River Basin: 213 - Sydney Coast and Georges River

Filter Results
  • Flood Project
    Construction projects - Work as executed plans

    Fairfield Golf Course detention basin construction project

    Completed
    Publication date: 26/03/2024
    Detention basin renewal and upgrade, consisting of construction works on earth embankment, concrete outlet structure, parking areas, fence, paths and other associated...

  • Flood Project
    Detailed Design

    Stockdale Reserve Detention Basin Upgrade

    Completed
    Publication date: 18/12/2023
    The Stockdale Reserve detention basin investigation and design aims to maximise the level of flood detention and failure protection to the downstream community and the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    OVERLAND FLOW FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN FOR HURSTVILLE,...

    Completed
    Publication date: 01/10/2023
    The Overland Flow Floodplain Risk Management Study and Plan for Hurstville, Mortdale and Peakhurst Wards (FRMS&P), which follows on from the Georges River Council - Overland...

  • Flood Project
    Flood study

    Greendale Creek Flood Study

    Completed
    Publication date: 28/07/2023
    The Greendale Creek Flood Study catchment area is located within the Northern Beaches Council Local Government Area. The study area includes parts of the suburbs of Beacon Hill,...

  • Flood Project
    Floodplain Risk Management Study

    Georges River Floodplain Risk Management Study

    Completed
    Publication date: 01/06/2023
    Collated electronic record of all flood data, including GIS data formatted into standard formats readable for all Councils. This will include a dataset of flood depth and extent...

  • Flood Project
    Flood study

    Campbelltown Southern Catchments Flood Study

    Completed
    Publication date: 10/03/2023
    The Campbelltown Southern Catchments Flood Study covers an area of 10.2 km2 within the Campbelltown City Council Local Government Area (LGA). The study area incorporates the...

  • Flood Project
    Flood study

    Cabravale Overland Flood Study

    Completed
    Publication date: 24/02/2023
    The Cabravale Overland Flow Flood Study was prepared for Fairfield City Council to define overland flood behaviour across the 11.5 km2 Cabravale study area. The flood study was...

  • Flood Project
    VHR/VP Reports

    Moorebank Voluntary Acquisition Scheme- Purchase of 78 Rickard Road Chipping Norton

    Completed
    Publication date: 03/02/2023
    Moorebank Voluntary Acquisition Scheme involves progressive acquisition of homes located within the Moorebank floodway area of the Georges River in the vicinity of Rickard Road...

  • Flood Project
    Floodplain Risk Management Study and Plan

    North Sydney LGA-wide Floodplain Risk Management Study and Plan

    Completed
    Publication date: 28/11/2022
    The Study Area is defined by the LGA boundary of North Sydney Council, as shown on Figure 1, with an area of 10.9 km2. The study area is completely urbanised, with several...

  • Flood Project
    Detailed Design

    King Park Detention Basin Upgrade - Design

    Completed
    Publication date: 29/09/2022
    King Park Detention Basin Upgrade - detailed engineering design drawings for the embankment renewal of the detention basin.

  • Flood Project
    Flood study

    Woronora River Flood Study – flood extents

    Completed
    Publication date: 29/06/2022
    The Woronora River Flood Study by NSW Public Works Department of August 1991 determined flood behaviour from the Needles to the Georges River confluence for a range of events....

  • Flood Project
    Floodplain Risk Management Study and Plan

    Woolooware Bay Floodplain Risk Management Study & Plan 2022

    Completed
    Publication date: 11/02/2022
    The Woolooware Bay catchment is located on the lower part of the Georges River floodplain within the Sutherland Shire Council LGA. Flooding of properties in the catchment has...

  • Flood Project
    Dam Safety Plan

    Dam Safety Emergency Plan (DSEP) Prospect Reservoir V3.2 December 2021

    Completed
    Publication date: 20/12/2021
    WaterNSW Dam Safety Emergency Plan for Prospect Reservoir V3.2 December 2021

  • Flood Project
    Flood study

    Lurline Bay, Matraville, Malabar & Yarra Bay Flood Study

    Completed
    Publication date: 13/10/2021
    The Lurline Bay, Matraville, Malabar & Yarra Bay Flood Study covers an area of 9.6 km2 within the southern sections of the Randwick City Council Local Government Area (LGA)....

  • Flood Project
    Detailed Design

    Mimosa Road Detention Basin Upgrade - Investigation and Design - Reports

    Completed
    Publication date: 30/06/2021
    The Three Tributaries Floodplain Risk Management Study and Plan (FRMS&P) project has identified the safety and performance of Council's flood detention basins, including the...

  • Flood Project
    Dam Safety Plan

    Dam Safety Emergency Plan (DSEP) Woronora Dam V3.2 June 2021

    Completed
    Publication date: 25/06/2021
    WaterNSW Dam Safety Emergency Plan for Woronora Dam V3.2 June 2021

  • Flood Project
    Floodplain Risk Management Study and Plan

    Botany Bay and Foreshore Beach Floodplain Risk Management Study and Plan

    Completed
    Publication date: 12/03/2021
    The Botany Bay and Foreshore Beach Catchment is located within the Bayside Council local government area, and includes parts of the suburbs of Botany, Pagewood and Banksmeadow....

  • Flood Project
    Flood study

    Waverley LGA Flood Study

    Completed
    Publication date: 15/01/2021
    This flood study defines flood behaviour in Waverley LGA under historical, existing and future conditions. The study focusses on overland flood conditions within the urban...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Dobroyd Canal and Hawthorne Canal Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/11/2020
    This study is a full assessment of the existing flood risk in the catchment. Includes damages assessment, identification of hotspots and emergency response. The Plan makes 11...

  • Flood Project
    Flood study

    Dam Safety Emergency Plan (DSEP) Woronora Dam V3.1 February 2020

    Completed
    Publication date: 28/02/2020
    WaterNSW Dam Safety Emergency Plan - Woronora Dam - V3.1 - February 2020