Flood ProjectFlood study
Redbank Creek Flood Study
CompletedPublication date: 17/04/2025The Redbank Creek Flood Study focuses on the Redbank Creek catchment and the township of North Richmond, located within the Hawkesbury Local Government Area (LGA), approximately...
-
Flood ProjectDetailed Design
St Marys Flood Protection Levee Upgrade – Investigation and Detail Design
CompletedPublication date: 31/12/2024This project is to undertake detailed investigations including detailed survey of the levee, a complete auditing of the levee to identify any structural defects including soil...
-
Flood ProjectFlood study
Hawkesbury-Nepean River Flood Study 2024
CompletedPublication date: 20/06/2024The Hawkesbury-Nepean River Flood Study (May 2024) identifies areas in the Valley affected by flooding from the Hawkesbury-Nepean River (including backwater flooding up...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lithgow Floodplain Risk Management Study and Plan
CompletedPublication date: 01/08/2023Lithgow City Council commissioned the preparation of a contemporaneous floodplain risk management study and plan for Lithgow and its immediate environs. The overall objectives...
-
Flood ProjectFloodplain Risk Management Study
Wianamatta South Creek Cumulative Impact Assessment (Rev E)
CompletedPublication date: 24/01/2023In recognition of the significant development pressures in the Wianamatta South Creek catchment, this Cumulative Impact Assessment was commissioned to inform Infrastructure NSW,...
-
Flood ProjectFloodplain Risk Management Study and Plan
Nepean River Floodplain Risk Management Study and Plan 2022
CompletedPublication date: 13/11/2022The study is to develop a Floodplain Risk Management Study and Plan (FRMSP) for the Nepean River catchment that addresses the existing, future and continuing flood problems,...
-
Flood ProjectFlood study
Review of Upper South Creek Flood Study in the Context of Ongoing Development
CompletedPublication date: 25/10/2022The Review of Upper South Creek Flood Study was prepared for Camden Council to provide information about the existing flood risk in the upper South Creek catchment. The study...
-
Flood ProjectFloodplain Risk Management Study and Plan
Goulburn Floodplain Risk Management Study and Plan
CompletedPublication date: 06/07/2022The study assesses the impacts of floods on the existing and future community and allows the identification of management measures to manage flood risk. The recommended measures...
-
Flood ProjectFlood study
Wianamatta South Creek Catchment Flood Study - Existing Conditions (Rev I)
CompletedPublication date: 23/05/2022The Wianamatta South Creek Catchment Flood Study - Existing Conditions (2022) report updates and extends a previous study prepared for Penrith City Council in association with...
-
Flood ProjectFloodplain Risk Management Study and Plan
College, Orth and Werrington Creeks Catchment Floodplain Risk Management...
CompletedPublication date: 27/04/2022Introduction Catchment Simulation Solutions has been commissioned to prepare the College, Orth and Werrington Creeks Catchment Floodplain Risk Management Study and Plan...
-
Flood ProjectFloodplain Risk Management Study and Plan
Nepean River Floodplain Risk Management Study and Plan
CompletedPublication date: 08/04/2022Cardno were commissioned by Camden Council to undertake a Floodplain Risk Management Study and Plan (FRMSP) for the Nepean River catchment. This FRMSP has been undertaken to...
-
Flood ProjectFloodplain Risk Management Study and Plan
Davistown and Empire Bay Floodplain Risk Management Study
CompletedPublication date: 31/03/2022Study Area Davistown and Empire Bay catchments are sub‐catchments of the Brisbane Water Estuary, which connects to Broken Bay Flood Risk The study area can be impacted by three...
-
Flood ProjectFloodplain Risk Management Study and Plan
Little Creek Catchment Floodplain Risk Management Study and Plan
CompletedPublication date: 21/02/2022Introduction Catchment Simulation Solutions has been commissioned to prepare the Little Creek Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...
-
Flood ProjectFlood study
Wingecarribee River Flood Study Update
CompletedPublication date: 18/02/2022Handover data for the February 2022 update to the Wingecarribee River Flood Study. Datasets include: - Data Compendium - GIS Layers - Hydraulic Model Files - Hydrologic Model...
-
Flood ProjectFloodplain Risk Management Study and Plan
Bullaburra to Linden Floodplain Risk Management Study and Plan
CompletedPublication date: 23/02/2021Floodplain Risk Management Study and Plan for tributaries and floodways within the Erskine and GLenbrook Creeks Catchment.
-
Flood ProjectFlood study
Coastal Lagoon Catchments Overland Flood Study
CompletedPublication date: 12/10/2020The Coastal Lagoon Catchments study area is approximately 75km north of Sydney and comprises four main catchments (Wamberal, Terrigal, Avoca and Cockrone Lagoons) encompassing a...
-
Flood ProjectFloodplain Risk Management Study and Plan
Stonequarry Creek (Picton) Floodplain Risk Management Study and Plan
CompletedPublication date: 30/09/2020The FRMS&P included a flood study update with ARR 2016 methods and TUFLOW modelling platform. The Flood Study Update included Overland Flooding in the Study Area.
-
Flood ProjectFloodplain Risk Management Study and Plan
Ourimbah Creek Floodplain Risk Management Study & Plan 2019
CompletedPublication date: 31/07/2020Study Objective The report identifies floodplain risk and options to manage the risk. Each option is assessed for effectivness and costed. Catchment Description The Ourimbah...
-
Flood ProjectFlood study
Local Overland Flow Path Study within Existing Urban Areas of Blacktown City
CompletedPublication date: 22/05/2020Blacktown Local Overland Flow Path Study for the existing urban areas within the Blacktown City Council LGA. It documents overland flood behaviour across the study area for a...
-
Flood ProjectFloodplain Risk Management Study and Plan
South Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 27/04/2020Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...