130 Flood Projects found

River Basin: 212 - Hawkesbury

Filter Results
  • Flood Project
    Flood study

    Rickabys Creek Catchment Flood Study

    Completed
    Publication date: 08/12/2025
    Flood study for the Rickabys Creek catchment.

  • Flood Project
    Floodplain Risk Management Study and Plan

    Peach Tree & Lower Surveyors Creeks Catchment Floodplain Risk Management...

    Completed
    Publication date: 30/06/2025
    The Peach Tree and Lower Surveyors Creeks Floodplain Risk Management Study covers an area of 1,250 hectares within The study area extends across parts of the suburbs of Penrith,...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Combined Macdonald River, Colo River, Webbs Creek and Greens Creek Flood...

    Completed
    Publication date: 27/06/2025
    Flood Study and Floodplain Risk Management Study and Plan for the Macdonald River, Colo River, Webbs Creek and Greens Creek catchments within the Hawkesbury City Council LGA.

  • Flood Project
    Flood study

    Redbank Creek Flood Study

    Completed
    Publication date: 17/04/2025
    The Redbank Creek Flood Study focuses on the Redbank Creek catchment and the township of North Richmond, located within the Hawkesbury Local Government Area (LGA), approximately...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Hawkesbury Floodplain Risk Management Study and Plan 2025

    Completed
    Publication date: 11/03/2025
    The study area includes the Hawkesbury River and surrounding tributaries located within the Hawkesbury Local Government Area. The study area extends from Agnes Banks to Wisemans...

  • Flood Project
    Detailed Design

    Doonmore Street Retarding Basin – Investigation and Detail Design

    Completed
    Publication date: 08/01/2025
    Introduction Royal HaskoningDHV (RHDHV) was commissioned to undertake the Investigation and Detail Design for a detention basin system within Penrith on behalf of Penrith City...

  • Flood Project
    Detailed Design

    St Marys Flood Protection Levee Upgrade – Investigation and Detail Design

    Completed
    Publication date: 31/12/2024
    This project is to undertake detailed investigations including detailed survey of the levee, a complete auditing of the levee to identify any structural defects including soil...

  • Flood Project
    VHR/VP Reports

    Scoping Study for Voluntary House Raising, Nepean River, Camden

    Completed
    Publication date: 16/07/2024
    This report documents the methodology and findings of the Scoping Study, including a review of the Nepean River FRMSP 2023 flood model results and assessment of the properties...

  • Flood Project
    Flood study

    Hawkesbury-Nepean River Flood Study 2024

    Completed
    Publication date: 20/06/2024
    The Hawkesbury-Nepean River Flood Study (May 2024) identifies areas in the Valley affected by flooding from the Hawkesbury-Nepean River (including backwater flooding up...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lithgow Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2023
    Lithgow City Council commissioned the preparation of a contemporaneous floodplain risk management study and plan for Lithgow and its immediate environs. The overall objectives...

  • Flood Project
    Floodplain Risk Management Study

    Wianamatta South Creek Cumulative Impact Assessment (Rev E)

    Completed
    Publication date: 24/01/2023
    In recognition of the significant development pressures in the Wianamatta South Creek catchment, this Cumulative Impact Assessment was commissioned to inform Infrastructure NSW,...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Nepean River Floodplain Risk Management Study and Plan 2022

    Completed
    Publication date: 13/11/2022
    The study is to develop a Floodplain Risk Management Study and Plan (FRMSP) for the Nepean River catchment that addresses the existing, future and continuing flood problems,...

  • Flood Project
    Flood study

    Review of Upper South Creek Flood Study in the Context of Ongoing Development

    Completed
    Publication date: 25/10/2022
    The Review of Upper South Creek Flood Study was prepared for Camden Council to provide information about the existing flood risk in the upper South Creek catchment. The study...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Goulburn Floodplain Risk Management Study and Plan

    Completed
    Publication date: 06/07/2022
    The study assesses the impacts of floods on the existing and future community and allows the identification of management measures to manage flood risk. The recommended measures...

  • Flood Project
    Flood study

    Wianamatta South Creek Catchment Flood Study - Existing Conditions (Rev I)

    Completed
    Publication date: 23/05/2022
    The Wianamatta South Creek Catchment Flood Study - Existing Conditions (2022) report updates and extends a previous study prepared for Penrith City Council in association with...

  • Flood Project
    Floodplain Risk Management Study and Plan

    College, Orth and Werrington Creeks Catchment Floodplain Risk Management...

    Completed
    Publication date: 27/04/2022
    Introduction Catchment Simulation Solutions has been commissioned to prepare the College, Orth and Werrington Creeks Catchment Floodplain Risk Management Study and Plan...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Nepean River Floodplain Risk Management Study and Plan

    Completed
    Publication date: 08/04/2022
    Cardno were commissioned by Camden Council to undertake a Floodplain Risk Management Study and Plan (FRMSP) for the Nepean River catchment. This FRMSP has been undertaken to...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Davistown and Empire Bay Floodplain Risk Management Study

    Completed
    Publication date: 31/03/2022
    Study Area Davistown and Empire Bay catchments are sub‐catchments of the Brisbane Water Estuary, which connects to Broken Bay Flood Risk The study area can be impacted by three...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Little Creek Catchment Floodplain Risk Management Study and Plan

    Completed
    Publication date: 21/02/2022
    Introduction Catchment Simulation Solutions has been commissioned to prepare the Little Creek Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...

  • Flood Project
    Flood study

    Wingecarribee River Flood Study Update

    Completed
    Publication date: 18/02/2022
    Handover data for the February 2022 update to the Wingecarribee River Flood Study. Datasets include: - Data Compendium - GIS Layers - Hydraulic Model Files - Hydrologic Model...