17 Flood Projects found

River Basin: 206 - Macleay

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Macleay River Floodplain Risk Management Study and Plan

    Completed
    Publication date: 29/08/2024
    The Lower Macleay River floodplain occupies approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...

  • Flood Project
    Flood study

    Lower Macleay Flood Study

    Completed
    Publication date: 22/11/2019
    The Lower Macleay River floodplain occupies an approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...

  • Flood Project
    Floodplain Risk Management Study

    Kempsey CBD Floodplain Risk Management Study

    Completed
    Publication date: 28/05/2017
    The Macleay River catchment covers an area of approximately 11500 square kilometres; the upper reaches of which are located within the New England Tablelands. The main...

  • Flood Project
    Floodplain Risk Management Plan

    Kempsey CBD Floodplain Risk Management Plan

    Completed
    Publication date: 28/05/2017
    The Macleay River catchment covers an area of approximately 11500 square kilometres; the upper reaches of which are located within the New England Tablelands. The objective of...

  • Flood Project
    Flood study

    Kempsey Hydraulic Model Tuflow Update

    Completed
    Publication date: 01/12/2016
    At the commencement of the Kempsey CBD Floodplain Risk Management Study and Plan it was decided to convert Council’s existing flood model to a TUFLOW model. It was considered...

  • Flood Project
    Flood study

    Kempsey Flood Study Hydraulic Modelling Report

    Completed
    Publication date: 01/08/2009
    The central business district (CBD) of Kempsey is sited on a natural overbank flow path of the Macleay River and is prone to severe flooding during floods in the order of the...

  • Flood Project
    Guidance, Tools and Resources

    Macleay River at Kempsey - Geomorphologic Assessment

    Completed
    Publication date: 01/03/2008
    There have been a number of studies previously undertaken on the bed dynamics and geomorphology of the lower Macleay River and its floodplain. These include broader assessments...

  • Flood Project
    Guidance, Tools and Resources

    Kempsey Levee Gradient Sensitivity Assessment

    Completed
    Publication date: 01/03/2008
    Levees are the main form of flood protection afforded to a number of regional NSW towns situated on major rivers. Levee designs have typically been based on actual historic peak...

  • Flood Project
    Guidance, Tools and Resources

    Macleay - Floodplain Survey

    Completed
    Publication date: 01/02/2007
    The Kempsey Local Emergency Management Committee had for some time been considering issues relating to flooding of the Lower Macleay Floodplain. Increasing development on the...

  • Flood Project
    Flood study

    Armidale Flood Study

    Completed
    Publication date: 24/04/2006
    The primary objective of this study is to define the flood behaviour of Dumaresq Creek at Armidale, and along the lower reaches of Martins Gully, Black Gully and Yoogoonda...

  • Flood Project
    Flood study

    Armidale Flood Study 2004

    Completed
    Publication date: 01/03/2005
    The primary objective of this study is to define the flood behaviour of Dumaresq Creek at Armidale, and along the lower reaches of Martins Gully, Black Gully and Yoogoonda...

  • Flood Project
    Flood study

    Walcha - Flood Study October 2004

    Completed
    Publication date: 01/10/2004
    The township of Walcha is located on the Apsley River in the Northern Tablelands of New South Wales. It is positioned about 300 km north of Sydney and 55 km south of Armidale....

  • Flood Project
    Floodplain Risk Management Plan

    Lower Macleay Floodplain Management Plan - Supplementary Report Covering the...

    Completed
    Publication date: 01/07/2004
    The Macleay River catchment covers some 11,500 square kilometres. The main tributaries, including the Aspley, Muddy and Chandler Rivers, rise in the Great Dividing Range and...

  • Flood Project
    Floodplain Risk Management Plan

    Upper Belmore Floodplain Management Strategy

    Completed
    Publication date: 07/07/2000
    The Upper Belmore area is situated in the Lower Macleay floodplain, the Belmore River being a major tributary of the Macleay River. The area comprises low lying land primarily...

  • Flood Project
    Flood study

    Armidale - Flood Mitigation Study December 1999

    Completed
    Publication date: 01/12/1999
    The Armidale Flood Mitigation Study analyses the effects of flooding on all buildings within the floodplains of Dumaresq Creek, Martins Gully, Black Gully and Unnamed Gully. The...

  • Flood Project
    Floodplain Risk Management Plan

    Lower Macleay Floodplain Management Plan

    Completed
    Publication date: 01/08/1999
    The Macleay River catchment covers some 11,500 square kilometres. The main tributaries including the Aspley, Muddy and Chandler Rivers rise in the Great Dividing Range and flow...

  • Flood Project
    Floodplain Risk Management Study

    Macleay Flood Plain Management Study

    Completed
    Publication date: 01/12/1980
    Macleay Valley Flood Plain Management Study from the New South Wales Coastal Rivers Flood Plain Management Studies - main report and summary report. Includes South West Rocks,...