Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

4 Flood Projects found

River Basin: 205 - Bellinger Tags: Bellinger River

Filter Results
  • Flood Project
    Flood study

    Report for Drainage Flood Study - Wheatley Street, Bellingen

    Completed
    Publication date: 29/06/2011
    The tributary draining to Wheatley Street conveys runoff from two tributaries and their catchments, one draining via Sunset Ridge Drive and the other draining under Ringwood...

  • Flood Project
    Post event flood behaviour reports

    Upper Bellinger River - Preliminary Flood Assessment Exhibition Report

    Completed
    Publication date: 01/11/2005
    The study area covers the Bellinger River from approximately Dardanelles Creek to Bellingen and Never Never River from Capararos Bridge above Gleniffer to its confluence with...

  • Flood Project
    Flood study

    Central Urunga Flood Study

    Completed
    Publication date: 09/06/1999
    Central Urunga catchment comprises 45 ha, or approximately one third of Urunga, including the town centre. Parts of the catchment experience regular low level “nuisance”...

  • Flood Project
    Flood study

    Lower Bellinger River - Flood Study Compendium of Data

    Completed
    Publication date: 01/10/1986
    The Bellinger and Kalang Rivers combine to flow into the Pacific Ocean approximately 25 kilometres south of Coffs Harbour in New South Wales at the town of Urunga. In June 1986,...