9 Flood Projects found

River Basin: 205 - Bellinger Organisations: Bellingen Shire Council

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Bellinger and Kalang Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2021
    This Floodplain Risk Management Study and Plan was developed by WMAWater for Bellingen Shire Council. The aims of the study were to: assess hazard and hydraulic hazard and...

  • Flood Project
    Flood study

    Lower Bellinger and Kalang River Flood Study

    Completed
    Publication date: 04/05/2015
    The study area includes the Bellinger River and Kalang River catchments. The Bellinger and Kalang Rivers are located within Bellingen Shire Council. The Bellinger and Kalang...

  • Flood Project
    Flood study

    Report for Drainage Flood Study - Wheatley Street, Bellingen

    Completed
    Publication date: 29/06/2011
    The tributary draining to Wheatley Street conveys runoff from two tributaries and their catchments, one draining via Sunset Ridge Drive and the other draining under Ringwood...

  • Flood Project
    Flood study

    Upper Kalang River Flood Assessment

    Completed
    Publication date: 01/12/2006
    The study area covers the Kalang River from approximately 1750 metres upstream of Kopsen's Bridge to the confluence of Pickett Hill Creek with the Kalang River. The total length...

  • Flood Project
    Post event flood behaviour reports

    Upper Bellinger River - Preliminary Flood Assessment Exhibition Report

    Completed
    Publication date: 01/11/2005
    The study area covers the Bellinger River from approximately Dardanelles Creek to Bellingen and Never Never River from Capararos Bridge above Gleniffer to its confluence with...

  • Flood Project
    Floodplain Risk Management Plan

    Bellingen Shire Council - Floodplain Risk Management Plan

    Completed
    Publication date: 01/04/2002
    Bellingen Shire Council, through its Floodplain Risk Management Committee, has prepared a draft Floodplain Risk Management Study and Plan. The Study and Plan have been prepared...

  • Flood Project
    Floodplain Risk Management Study

    Bellingen Shire Council: Floodplain Risk Management Study (Stage 2 - An Asses...

    Completed
    Publication date: 01/04/2002
    Bellingen Shire Council through its Floodplain Risk Management Committee has prepared a Floodplain Risk Management Study in accordance with the NSW Governments Flood Prone Land...

  • Flood Project
    Flood study

    Central Urunga Flood Study

    Completed
    Publication date: 09/06/1999
    Central Urunga catchment comprises 45 ha, or approximately one third of Urunga, including the town centre. Parts of the catchment experience regular low level “nuisance”...

  • Flood Project
    Flood study

    Lower Bellinger River - Flood Study Compendium of Data

    Completed
    Publication date: 01/10/1986
    The Bellinger and Kalang Rivers combine to flow into the Pacific Ocean approximately 25 kilometres south of Coffs Harbour in New South Wales at the town of Urunga. In June 1986,...