Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

31 Flood Projects found

River Basin: 205 - Bellinger

Filter Results
  • Flood Project
    Flood study

    Middle Creek Flood Study and Floodplain Risk Managment Study and Plan (2021)

    Completed
    Publication date: 01/12/2021
    The Middle Creek Flood Study provides a new flood model that incorporates advances in numerical modelling techniques and technology, updated topographic survey (e.g. LiDAR) and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Bellinger and Kalang Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2021
    This Floodplain Risk Management Study and Plan was developed by WMAWater for Bellingen Shire Council. The aims of the study were to: assess hazard and hydraulic hazard and...

  • Flood Project
    Flood study

    Coffs Creek and Park Beach Flood Study (2018)

    Completed
    Publication date: 01/05/2018
    The Coffs Creek and Park Beach Flood Study has been prepared for Coffs Harbour City Council (Council) to define the existing flood behaviour in the catchment and establish the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Woolgoolga Floodplain Risk Management Study and Plan

    Completed
    Publication date: 11/02/2016
    The Woolgoolga Lake catchment encompasses an area of approximately 22 square kilometres located on the New South Wales North Coast. The lake is located behind the coastal dune...

  • Flood Project
    Flood study

    Lower Bellinger and Kalang River Flood Study

    Completed
    Publication date: 04/05/2015
    The study area includes the Bellinger River and Kalang River catchments. The Bellinger and Kalang Rivers are located within Bellingen Shire Council. The Bellinger and Kalang...

  • Flood Project
    Flood study

    Hydraulic Modelling Report Nambucca River and Warrell Creek

    Completed
    Publication date: 19/11/2013
    The objective of this study is to define the existing flood behaviour within the Nambucca River and Warrell Creek. The study area is defined as: Approximately 2km upstream...

  • Flood Project
    Flood study

    Deep Creek Flood Study

    Completed
    Publication date: 11/11/2013
    Deep Creek is located on the NSW north coast within the Nambucca Shire Council area. Deep Creek outflows to the ocean at Valla. The creek has a catchment area of 92 square...

  • Flood Project
    Flood study

    Glenreagh Flood Study (Extension of Orara Flood Study)

    Completed
    Publication date: 20/09/2013
    The Orara River and Bucca Bucca Creek catchments are located to the west of Coffs Harbour on the NSW Mid North Coast. Both creeks drain to the Clarence River at Grafton. The...

  • Flood Project
    Flood study

    Woolgoolga Flood Study

    Completed
    Publication date: 31/05/2012
    Woolgoolga is situated on the north coast of NSW approximately 20km north of the city of Coffs Harbour. The Woolgoolga Lake catchment occupies a total catchment area of around...

  • Flood Project
    Flood study

    Report for Drainage Flood Study - Wheatley Street, Bellingen

    Completed
    Publication date: 29/06/2011
    The tributary draining to Wheatley Street conveys runoff from two tributaries and their catchments, one draining via Sunset Ridge Drive and the other draining under Ringwood...

  • Flood Project
    Concept Design

    Concept Design for the: Coffs Harbour Flood Warning System

    Completed
    Publication date: 05/11/2010
    Coffs Harbour is subject to flash flooding (sudden, violent flooding after a heavy rain). The flooding can be both localised and widespread with the impact on the local...

  • Flood Project
    Post event data collection

    Nambucca Shire Council - Compilation of Flood Marks, Rainfall Data and Observ...

    Completed
    Publication date: 31/12/2009
    The 5 floods that hit the Nambucca Valley in 2009 saw the local rivers and waterways rise significantly; however the exact height of these flood levels was initially unknown....

  • Flood Project
    Flood study

    Upper Kalang River Flood Assessment

    Completed
    Publication date: 01/12/2006
    The study area covers the Kalang River from approximately 1750 metres upstream of Kopsen's Bridge to the confluence of Pickett Hill Creek with the Kalang River. The total length...

  • Flood Project
    Post event flood behaviour reports

    Upper Bellinger River - Preliminary Flood Assessment Exhibition Report

    Completed
    Publication date: 01/11/2005
    The study area covers the Bellinger River from approximately Dardanelles Creek to Bellingen and Never Never River from Capararos Bridge above Gleniffer to its confluence with...

  • Flood Project
    Floodplain Risk Management Study

    Coffs Creek Floodplain Risk Management Study

    Completed
    Publication date: 04/10/2005
    Coffs Creek is a relatively small, but highly populated catchment on the mid north coast of New South Wales. The creek is approximately 12km long and has a catchment area...

  • Flood Project
    Floodplain Risk Management Plan

    Bellingen Shire Council - Floodplain Risk Management Plan

    Completed
    Publication date: 01/04/2002
    Bellingen Shire Council, through its Floodplain Risk Management Committee, has prepared a draft Floodplain Risk Management Study and Plan. The Study and Plan have been prepared...

  • Flood Project
    Floodplain Risk Management Study

    Bellingen Shire Council: Floodplain Risk Management Study (Stage 2 - An Asses...

    Completed
    Publication date: 01/04/2002
    Bellingen Shire Council through its Floodplain Risk Management Committee has prepared a Floodplain Risk Management Study in accordance with the NSW Governments Flood Prone Land...

  • Flood Project
    Flood study

    Coffs Creek Flood Study

    Completed
    Publication date: 01/05/2001
    Coffs Creek has a catchment area of 24 square kilometres to the Pacific Ocean and is enclosed by heavily vegetated hills rising steeply to a maximum elevation of around 400 m....

  • Flood Project
    Floodplain Risk Management Study

    Lower Nambucca River Floodplain Management Study

    Completed
    Publication date: 01/11/1999
    The area to be covered by the Floodplain Management Study and Plan is the Nambucca River floodplain below Wirrimbi Island on the Nambucca River, Congarrinni Bridge on Taylors...

  • Flood Project
    Floodplain Risk Management Plan

    Floodplain Management Plan Bonville and Middle Creeks, Coffs Harbour

    Completed
    Publication date: 01/07/1999
    The Bonville Creek catchment is located to the south of Coffs Harbour on the mid north coast of New South Wales. The catchment extends approximately 16 km inland to Tuckers Nob...