-
Flood ProjectFloodplain Risk Management Study and Plan
Bonalbo Floodplain Risk Management Study and Plan
CompletedPublication date: 23/04/2024The Bonalbo Floodplain Risk Management Study has been prepared under the Floodplain Risk Management Process, funded by both Kyogle Council and the NSW State Government. This...
-
Flood ProjectFloodplain Risk Management Study and Plan
Wooli Floodplain Risk Management Study and Plan
CompletedPublication date: 26/03/2024At its meeting of 26 September 2023 the Wooli FRMS and FRMP was adopted by Council, subject to the addition of a Flood Frequency Analysis to be placed on public exhibition for...
-
Flood ProjectFlood study
Wooli Flood Study
CompletedPublication date: 01/10/2023This 2023 report was undertaken to update the Wooli River Flood Study to allow informed decisions on managing flood risk, as the previous Wooli Floodplain Risk Management Study...
-
Flood ProjectFlood study
Lower Clarence Flood Model Update 2022
CompletedPublication date: 31/08/2023The Lower Clarence Flood Model extends from Mountain View, upstream of Grafton, to the Ocean at Yamba and is used to simulate the flood behaviour of the lower Clarence River and...
-
Flood ProjectFlood study
Urbenville and Woodenbong Flood Study
CompletedPublication date: 09/02/2022Flooding at Woodenbong and Urbenville are subject to two types of flooding; overland flows from local catchments and mainstream from Tooloom Creek and its tributaries. At...
-
Flood ProjectFlood study
Bonalbo Flood Study
CompletedPublication date: 21/10/2021The Bonalbo Flood Study has been prepared under the Floodplain Risk Management Process to develop a detailed understanding of the flood behaviour at Bonalbo from both Peacock...
-
Flood ProjectFloodplain Risk Management Study and Plan
Tabulam Floodplain Risk Management Study and Plan
CompletedPublication date: 10/12/2019Final reports, model and spatial data
-
Flood ProjectFloodplain Risk Management Plan
Grafton and Lower Clarence Floodplain Risk Management Plan: Review of...
CompletedPublication date: 07/02/2014Brushgrove is a small rural village situated between the Clarence River and South Arm tributary at the south-western end of Woodford Island, approximately 17km downstream of...
-
Flood ProjectFlood study
Orara River Flood Study
CompletedPublication date: 18/06/2012The Orara River and Bucca Bucca Creek (Bucca Creek) catchments are located to the west of Coffs Harbour on the NSW Mid North Coast (Appendix A). Both creeks drain to the...
-
Flood ProjectFloodplain Risk Management Plan
Yamba Floodplain Risk Management Plan
CompletedPublication date: 01/02/2009The Clarence River has a catchment area of some 21,900 km² to its mouth at Yamba, and some 19,800 km² to Grafton. Grafton is the main commercial centre in the region and the...
-
Flood ProjectFloodplain Risk Management Study
Yamba Floodplain Risk Management Study
CompletedPublication date: 13/10/2008Yamba is located at the mouth of the Clarence River and is effectively surrounded by water with the Pacific Ocean to the east, the Clarence River to the north, Oyster Channel to...
-
Flood ProjectFlood study
Dorrigo Flood Study
CompletedPublication date: 01/12/2007The Dorrigo Flood Study has been undertaken to provide flood information for establishment of a floodplain risk management plan for Dorrigo. The end use of this studywill most...
-
Flood ProjectFlood study
Grafton & Lower Clarence Floodplain Risk Management Plan
CompletedPublication date: 01/06/2007The study area essentially covers the Lower Clarence River floodplain downstream of Junction Hill, except those areas that are covered by separate floodplain management studies...
-
Flood ProjectFloodplain Risk Management Plan
Iluka Floodplain Risk Management Plan
CompletedPublication date: 23/03/2007The Clarence River has a catchment area of some 21,900 square kilometres to its mouth at the Pacific Ocean and some 19,800 square kilometres to Grafton. The catchment is bounded...
-
Flood ProjectGeotech Report on levee
Levee Stability & Structural Integrity Investigation at Grafton City...
CompletedPublication date: 01/03/2003The Clarence River County Council (CRCe) constructed the levee in North Grafton in 1969. The majority of the levee is situated along the top of the riverbank. The levee...
-
Flood ProjectFlood study
Alipou Creek Flood Study
CompletedPublication date: 01/02/1998In August 1997, Water Studies Ply Ltd was requested by Clarence River County Council (CRCC) to undertake a flood study to investigate flooding behaviour in the Alipou Basin...
-
Flood ProjectGuidance, Tools and Resources
Clarence River - Data Compilation Study
CompletedPublication date: 01/03/1995The study area is the Clarence River from the coast upstream to the tidal limit at Copmanhurst on the main arm and the confluence with Flaggy Creek on the Orara River, including...
-
Flood ProjectGuidance, Tools and Resources
Palmers Island: Bank Erosion Assessment & Management Plan
CompletedPublication date: 01/12/1992Patterson Britton & Partners was engaged by Maclean Shire Council to carry out an investigation into the structural and non-structural options available to resolve both the...
-
Flood ProjectFlood study
Lower Clarence River Flood Study Review
SupersededPublication date: 02/04/2004The Clarence River catchment is located on the far north coast of NSW is one of the largest on the east coast of Australia with an area of approximately 20,000 square...
-
Flood ProjectGuidance, Tools and Resources
Probable Maximum Precipitation Study for the Clarence River Catchment
SupersededPublication date: 01/11/1984The Clarence River Valley in the north coast region of N.S.W. has a long history of flooding, especially at Grafton. In recent years, the urban areas of Grafton and South...