Flood ProjectFlood Warning Reports
Pending Tweed and Brunswick Rivers flood warning improvement Recommendations Report
CompletedPublication date: 02/12/2024This document summarises a literature review and gap analysis of the existing flood warning network to identify recommendations related to the improvement of flood warning...
-
Flood ProjectPost event flood behaviour reports
Post 2022 Event Flood Behaviour Analysis Tweed River -Report Only
CompletedPublication date: 01/03/2024The Tweed River experienced flooding on 28 February 2022, with river levels exceeding the March 2017 highest peak on record for Mullwillumbah, Uki and Tumblegum. Flood waters...
-
Flood ProjectFloodplain Risk Management Study and Plan
South Murwillumbah Floodplain Risk Management Study and Plan
CompletedPublication date: 21/11/2019A local Floodplain Risk Management Study and Plan for the South Murwillumbah locality. The study evaluates various possible flood mitigation measures for the area and nominates...
-
Flood ProjectFloodplain Risk Management Study and Plan
Murwillumbah CBD Levee & Drainage Study
CompletedPublication date: 22/08/2018A study to better define flooding and drainage behaviour within the CBD associated with local catchment runoff as well as levee overtopping. A key objective of the study was to...
-
Flood ProjectFloodplain Risk Management Study and Plan
Tweed Coastal Creeks Floodplain Risk Management Study and Plan
CompletedPublication date: 09/03/2016Tweed Coastal Creeks Floodplain Risk Management Study and Plan is the result of a detailed investigation and consideration of flood risk across the study area. The process to...
-
Flood ProjectFloodplain Risk Management Plan
Tweed Coastal Creeks Floodplain Risk Management Plan
CompletedPublication date: 10/12/2015The study area is approximately 255 square kilometres, bounded by the town of Kingscliff to the north and the Tweed Byron Shire boundary to the south, and includes the...
-
Flood ProjectFloodplain Risk Management Study
Tweed Valley Floodplain Risk Management Study
CompletedPublication date: 13/10/2014This Study draws together a wide range of floodplain management options which have been investigated as part of the Tweed Valley Floodplain Risk Management Study. These options...
-
Flood ProjectFlood study
Tweed-Byron Coastal Creeks - Flood Study
CompletedPublication date: 01/03/2010The coastal creeks of northern New South Wales between Brunswick Heads and Tweed Heads have a long history of flooding, with a major flood event occurring recently in June 2005....
-
Flood ProjectFlood study
Tweed Valley -2009 Flood Study Update
CompletedPublication date: 19/12/2009Tweed Shire Council was one of the first Councils in New South Wales to undertake flood studies for the purposes of defining planning controls and determining the impact of...
-
Flood ProjectGuidance, Tools and Resources
Tweed Valley - Floodplain Risk Management Policy
CompletedPublication date: 18/12/2007This policy establishes Council’s framework for management of the existing, future and continuing flood risk for property affected by flooding within the Tweed Shire. The policy...
-
Flood ProjectGuidance, Tools and Resources
East Murwillumbah & William/Dorothy Streets, Murwillumbah - Floodplain...
CompletedPublication date: 01/08/1999This report has been prepared for Tweed Shire Council and investigates floodplain management options for the East Murwillumbah and William/Dorothy Streets Area of the...
-
Flood ProjectGuidance, Tools and Resources
The Impact of Storm Setup on Estuary Flooding - The Tweed Experience in 1984
CompletedPublication date: 01/04/1986"During April 1984, a severe storm in the region caused flooding on the lower Tweed River. The Water Research Laboratory (acting through Unisearch Ltd) was commissioned to...
-
Flood ProjectGuidance, Tools and Resources
New Barneys Point Bridge With Interim Roadway - Flood Simulations
CompletedPublication date: 01/11/1984A mathematical flood model of Chinderah was used to simulate the occurrence of a design 1 in 100 year flood for conditions after the proposed bridge construction. The details of...
-
Flood ProjectFloodplain Risk Management Study
Tweed Valley Flood Plain Management Study
SupersededPublication date: 01/12/1980Tweed Valley study from the New South Wales Coast Rivers Flood Plain Management Studies series. Two volumes - main report and summary report