1,403 Flood Projects found

Filter Results
  • Flood Project
    Flood study

    Lower Parramatta River Flood Study

    Completed
    Publication date: 01/02/1986
    Flood levels and discharge distributions have been computed for the 1%, 2% and 5% probability floods for the Lower Parramatta River from Charles Street Weir to Ryde Bridge and...

  • Flood Project
    Flood study

    Greystanes Creek and Pendle Hill Creek Flood Mitigation Study

    Completed
    Publication date: 01/12/1985
    Greystanes Creek and Pendle Hill Creek are tributaries of Toongabbie Creek which itself becomes the Parramatta River. The objective of these works is to maximise the reduction...

  • Flood Project
    Flood study

    Flood Study for Proposed Wyong River Weirs

    Completed
    Publication date: 01/05/1985
    Backwater profile computations were carried out for the Wyong River as part of a preliminary study into the hydraulic effects of the proposed Upper Wyong Weir and the...

  • Flood Project
    Flood study

    Erina Creek Flood Study

    Completed
    Publication date: 01/05/1985
    Erina Creek has a catchment area of some 32 square km. It rises in The Ridgeway district and flows in a generally south-western direction discharging into Brisbane Water near...

  • Flood Project
    Floodplain Risk Management Study

    Fairfield Flood Mitigation Study

    Completed
    Publication date: 01/04/1985
    Flood prone lands in the Fairfield City Council (FCC) area are shown on two sets of maps. These are the Lower Georges River Preliminary Flood Plain Atlas issued by the Public...

  • Flood Project
    Floodplain Risk Management Study

    Camden Floodplain Management Strategy Study

    Completed
    Publication date: 01/03/1985
    The Nepean River and its headwater tributaries, the Avon, Cordeaux and Cataract Rivers, rise in the Illawarra Range to the west of Wollongong at an elevation of about 500 in....

  • Flood Project
    Flood study

    Cooks River Flood Study

    Completed
    Publication date: 01/02/1985
    This study is directed to determining the one, two and five percent probability design flood levels for:- the Cooks River between Brighton Avenue, Canterbury and the Alexandra...

  • Flood Project
    Review of Environmental Factors

    Lower Narara Creek - Flood Study Compendium Of Data

    Completed
    Publication date: 01/01/1985
    Narara Creek is located north of Brisbane Water and lies within the local government area administered by Gosford City Council. The creek has been the subject of several studies...

  • Flood Project
    Post event flood behaviour reports

    Camden, Penrith - Report on the 1867 Flood

    Completed
    Publication date: 01/01/1985
    This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...

  • Flood Project
    Floodplain Risk Management Study

    Macquarie Valley Flood Plain Management Studies

    Completed
    Publication date: 01/01/1984
    The Macquarie Basin extends in a north-westerly direction from the Great Dividing Range near Oberon, to the Barwon River between Brewarrina and Walgett and covers an area of...

  • Flood Project
    Flood study

    Lower Wyong River Flood Study

    Completed
    Publication date: 01/01/1984
    The Wyong River has a catchment area of 422 square kilometres and drains into Tuggerah Lakes system at Tacoma. This reports deal with flood behaviour of the lower flood plain...

  • Flood Project
    Flood study

    Moorebank-Milperra Floodway Study, City of Bankstown

    Completed
    Publication date: 01/09/1983
    The catchment of the Georges River is extensive and covers almost 1000 square kilometres. Although major floods generally result from prolonged heavy rainfall in the upper part...

  • Flood Project
    Flood study

    Moorebank-Milperra - Floodway Study May 1983 (Liverpool)

    Completed
    Publication date: 01/05/1983
    Since the earliest days of settlement along the Georges River there have been a number of major floods. The area most susceptible to flood damage lies between Liverpool and East...

  • Flood Project
    Floodplain Risk Management Study

    Cut Rock Creek Valley Flood Plain Management Study

    Completed
    Publication date: 01/01/1983
    The Cut Rock Creek flood plain management study is one of a series being undertaken along the coast of NSW in catchments identified as: having significant existing flooding...

  • Flood Project
    Floodplain Risk Management Study

    Cut Rock Creek Valley Flood Plain Management Study

    Completed
    Publication date: 01/06/1982
    This report outlines the development and recommendation of flood plain management strategies for Cut Rock Creek Valley on the Central Coast of New South Wales. The study area...

  • Flood Project
    Flood study

    Retarding Basin Drainage Study for the Kincumber Urban Release Area

    Completed
    Publication date: 01/04/1982
    In association with the ongoing development of East and West Kincumber, as defined by the Kincumber Urban Release Area, Gosford City Council has commissioned this report to...

  • Flood Project
    Floodplain Risk Management Study

    Georges River Flood Plain Management Study

    Completed
    Publication date: 01/05/1980
    In March 1979, Sinclair Knight & Partners Pty Ltd were commissioned by the Department of Public Works to carry out flood plain management studies for the Richmond, Hunter,...

  • Flood Project
    Flood study

    Centennial Park Flood Drainage Study

    Completed
    Publication date: 01/10/1979
    FLOODING Surcharge of the pipe and open channel system causes flooding in the area surrounding the intersection of Doncaster Avenue and Anzac Parade, and in Monramie Avenue...

  • Flood Project
    Floodplain Risk Management Study

    Flood Plain Management Study Erina Creek

    Completed
    Publication date: 01/09/1976
    This study has appraised current flood plain management principles and determined parameters appropriate to the control of development within the Erina Creek flood plain. Study...

  • Flood Project
    Flood study

    Gosford - Wyong Area Drainage & Flooding Study

    Completed
    Publication date: 01/09/1974
    This report is primarily concerned with delineation of the limits of the flood prone areas in the Gosford/Wyong Urban development area. Flood Limits, Flood Mitigation, and...