-
Flood ProjectFloodplain Risk Management Study and Plan
Stonequarry Creek (Picton) Floodplain Risk Management Study and Plan
CompletedPublication date: 30/09/2020The FRMS&P included a flood study update with ARR 2016 methods and TUFLOW modelling platform. The Flood Study Update included Overland Flooding in the Study Area.
-
Flood ProjectFlood study
Stonequarry Creek - 2D Modelling & Climate Change Assessment
CompletedPublication date: 16/07/2011Since the Picton Flood Study Report, 1989 (Department of Water Resources), and subsequent Flood Plain Management Study (1992), there has been significant development in the...
-
Flood ProjectGuidance, Tools and Resources
Picton Local Flood Policy
CompletedPublication date: 01/05/2000The primary objective of this policy is to reduce the impact of flooding and flood liability on individual land owners and occupiers and to reduce private and public losses...
-
Flood ProjectGuidance, Tools and Resources
Stonequarry Creek - Vegetation Management Plan Final
CompletedPublication date: 01/04/1996The Vegetation Management Plan for Stonequarry Creek has been developed for Wollondilly Shire Council as part of the Stonequarry Creek Floodplain Management Plan and fulfils the...
-
Flood ProjectGuidance, Tools and Resources
Warragamba - Flood Frequency & Flood Modelling Studies
CompletedPublication date: 01/10/1992This report describes the work that has been carried out by Webb, McKeown & Associates from April, 1992, in accordance with a Brief dated 16 April, 1992 issued by the...
-
Flood ProjectFloodplain Risk Management Study
Stonequarry Creek Floodplain Management Study
CompletedPublication date: 01/09/1992Wollondilly Shire Council, through the Picton Floodplain Management Committee, developed a floodplain management strategy for the Stonequarry Creek Floodplain in Picton. The...
-
Flood ProjectGuidance, Tools and Resources
Warragamba River - Flood Frequency Analysis
CompletedPublication date: 01/04/1992Flood frequency curves on the Warragamba River at the dam site were developed for past, present and possible future conditions. These curves were developed from a relatively...
-
Flood ProjectFlood study
Cawdor Flood Study
CompletedPublication date: 01/02/1991Northrop Consultants have been commissioned by West Coast Developments on a brief prepared by Wollondilly Shire Council to examine the flooding hazard of the Cawdor Urban...
-
Flood ProjectFlood study
Warragamba Flood Study - Hydrologic Modelling of The Hawkesbury/Nepean Catchment
CompletedPublication date: 01/06/1989As a result of increases in estimates of Probable Maximum Precipitation (PMP) over the past 40 years it is now apparent that Warragamba Dam is unsafe; even after the current...
-
Flood ProjectFlood study
Picton Flood Study Report
CompletedPublication date: 01/02/1989Picton is an urban centre with a population of 2100. It is an important service town for the surrounding district where the major pursuits are dairy farming, horse studs and...
-
Flood ProjectGuidance, Tools and Resources
Picton - Flood Extent & Hazard
CompletedPublication date: 11/11/1111Picton flood extent (1% AEP and the PMF) as well as hazard categories (flood fringe and flood way).
-
Flood ProjectFlood study
Picton / Stonequarry Creek Flood Study (Updated Final Draft)
DeprecatedPublication date: 15/09/2017Draft Flood Study placed on Exhibition and including incorporation of the 2016 Post Event Analysis (published as Worley Parsons)
-
Flood ProjectPost event flood behaviour reports
Picton Post Event Analysis - June 2016 Weather and Flood Event (draft)
DeprecatedPublication date: 31/10/2016Draft Report on the 2016 Flood event that occurred when an existing Flood Study was unpublished.