Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

15 Flood Projects found

Organisations: Penrith City Council

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Little Creek Catchment Floodplain Risk Management Study and Plan

    Completed
    Publication date: 21/02/2022
    Introduction Catchment Simulation Solutions has been commissioned to prepare the Little Creek Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    South Creek Floodplain Risk Management Study and Plan

    Completed
    Publication date: 27/04/2020
    Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Penrith CBD Floodplain Risk Management Study and Plan

    Completed
    Publication date: 23/03/2020
    Introduction Molino Stewart has been commissioned to prepare the Penrith CBD Floodplain Risk Management Study and Plan (FRMS&P) on behalf of Penrith City Council (Council)...

  • Flood Project
    Floodplain Risk Management Study and Plan

    St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan

    Completed
    Publication date: 23/03/2020
    Introduction Lyall & Associates has been commissioned to prepare the St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...

  • Flood Project
    Flood study

    Peach Tree and Lower Surveyors Creek Flood Study

    Completed
    Publication date: 01/04/2019
    The Peach Tree and Lower Surveyors Creeks Flood Study covers an area of 1,250 hectares within the Penrith City Council Local Government Area (LGA). As shown in Figure 1, the...

  • Flood Project
    Flood study

    Nepean River Flood Study

    Completed
    Publication date: 12/11/2018
    The Hawkesbury-Nepean River catchment is one of the largest coastal basins in NSW with an area of 21,400 square kilometres. The catchment at Penrith is 52% of the total area and...

  • Flood Project
    Flood study

    College, Orth and Werrington Creeks Catchment Overland Flow Flood Study

    Completed
    Publication date: 05/06/2017
    The College, Orth and Werrington Creeks Catchment Overland Flow Flood Study was prepared for Penrith City Council to identify main stream and overland flood behaviour across the...

  • Flood Project
    Flood study

    Little Creek Catchment Overland Flow Flood Study

    Completed
    Publication date: 01/06/2017
    The Little Creek catchment is located north of the M4 Motorway and drains to South Creek with the study area covering parts of the suburbs of Oxley Park, Colyton, St Marys and...

  • Flood Project
    Flood study

    Penrith CBD Detailed Overland Flow Flood Study

    Completed
    Publication date: 07/07/2015
    Penrith City Council completed a broad-scale overland flow flood study (”Overview Study”) in October 2006 (Cardno Lawson Treloar, 2006) in order to prioritise future detailed...

  • Flood Project
    Floodplain Risk Management Plan

    Hawkesbury-Nepean Floodplain Management Strategy Implementation

    Completed
    Publication date: 01/10/2004
    Table of contents: The Hawkesbury-Nepean flood problem Providing effective evacuation routes Better flood forecasting and warning Improved flood emergency response...

  • Flood Project
    Guidance, Tools and Resources

    Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study E...

    Completed
    Publication date: 06/03/2002
    This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...

  • Flood Project
    Flood study

    Flood Levels Assessment for Filling within the Floodplain of South Creek

    Completed
    Publication date: 01/04/1997
    A hydraulic assessment of flood levels in South Creek was conducted to determine the impact of filling within the ADI site floodplain. An existing Department of Land & Water...

  • Flood Project
    Flood study

    Nepean River at Penrith Flood Study

    Completed
    Publication date: 01/04/1997
    The Nepean River Flood Study at Penrith was commenced in March 1995 to consolidate previous studies covering this area and establish flooding behaviour under existing floodplain...

  • Flood Project
    Flood study

    Peach Tree Creek - Flood Study

    Completed
    Publication date: 01/09/1994
    The purpose of the study was to define flood behaviour in the Peach Tree Creek floodplain, which is located on the right bank of the Nepean. River between the M4 Motorway and...

  • Flood Project
    Post event flood behaviour reports

    Camden, Penrith - Report on the 1867 Flood

    Completed
    Publication date: 01/01/1985
    This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...