    Guidance, Tools and Resources

    Revised 2016 Design Rainfalls Investigations into the need for and Derivation...

    Completed
    Publication date: 26/07/2018
    In 2016, a revision of Australian Rainfall and Runoff was released with updated IFD design rainfalls. The IFDs were derived using more data and modern methods than previous...

  • Flood Project
    Post event data collection

    Flood Data Collection, Dungog and Stroud - Flood Event 21 April 2015

    Completed
    Publication date: 29/05/2015
    This report has been prepared for the New South Wales Office of Environment and Heritage by Paterson Consultants Pty Ltd, Grafton. Severe floods were recorded on Tuesday, 21...

  • Flood Project
    Floodplain Risk Management Study

    Floodplain Risk Management Study for Silverton

    Completed
    Publication date: 07/01/2014
    Silverton is located approximately 25 kilometres north-west of Broken Hill and is accessible by sealed road. The central urban area is a typical grid pattern running in a...

  • Flood Project
    Guidance, Tools and Resources

    Gwydir Valley - Annual Environmental Watering Plan 2012-2013

    Completed
    Publication date: 01/10/2012
    The Gwydir Valley Annual Environmental Watering Plan 2012-13 outlines the objectives and potential actions for environmental water delivery in the Gwydir catchment for the...

  • Flood Project
    Post event flood behaviour reports

    Hay to Maude - Flood Gaugings - March/April 2012

    Completed
    Publication date: 01/03/2012
    Information on flow measurement gaugings and or/height data collected from the NSW Office of Water Gauging stations at Hay, Maude, Carrathool and Darlington Point. This includes...

  • Flood Project
    Floodplain Risk Management Plan

    Warrah Creek - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Floodplain Risk Management Plan

    Lachlan River Jemalong Gap to Condobolin - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP has been prepared to provide strategic guidance to NSW government agencies and landholders in the management of floodwaters on the Lachlan River (Jemalong Gap to...

  • Flood Project
    Post event flood behaviour reports

    Northern Rivers NSW - Flood Summary May 2009

    Completed
    Publication date: 28/02/2011
    This report was commissioned by the New South Wales Department of Environment, Climate Change and Water (DECCW) in collaboration with State Emergency Service (SES) to summarise...

  • Flood Project
    Floodplain Risk Management Plan

    Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Managemen...

    Completed
    Publication date: 01/01/2011
    This Stage 2 floodplain management plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Edward and Niemur Rivers Stage 3: Moama-Moulamein Railway to Liewah and Malla...

    Completed
    Publication date: 01/01/2011
    This Stage 3 floodplain management plan (Stage 3 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...

  • Flood Project
    Floodplain Risk Management Plan

    Billabong Creek: Walbundrie to Jerilderie Floodplain Management Plan - Flood ...

    Completed
    Publication date: 01/12/2010
    The Billabong Creek floodplain management plan (FMP) was gazetted in July 2006. The FMP applies to the Billabong Creek floodplain between Walbundrie and downstream of...

  • Flood Project
    Floodplain Risk Management Plan

    Moomin Creek - Floodplain Management Plan

    Completed
    Publication date: 01/10/2010
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Guidance, Tools and Resources

    Floristic Assessment of the Lower Macquarie River

    Completed
    Publication date: 01/09/2010
    This report describes the results of a floristic assessment of the lower Macquarie River. The floristic assessment was undertaken along the Macquarie River from the end of the...

  • Flood Project
    Floodplain Risk Management Plan

    Report for Edward & Wakool Rivers - Stage 1 Floodplain Management Plan: Balpo...

    Completed
    Publication date: 27/07/2010
    This report documents the results of investigations to assess hydraulic impacts associated with flood control works on the Balpool Station property at Balpool. The property is...

  • Flood Project
    Floodplain Risk Management Study

    Lachlan River Floodplain Risk Management Study (Gooloogong to Jemalong Gap)

    Completed
    Publication date: 01/04/2010
    The study area for the draft FMP incorporates the floodplain area covered by the 1979 Guidelines. It extends from Gooloogong in the east to Jemalong Gap in the Jemalong Range in...

  • Flood Project
    Guidance, Tools and Resources

    NSW Floodplain Risk Management Database Scoping Study

    Completed
    Publication date: 01/04/2008
    The Department of Environment and Climate Change (DECC) is considering the development of a database containing information relating to floodplain risk management (FRM) to...

  • Flood Project
    Visual Levee Audits

    Barham Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW

    Completed
    Publication date: 01/02/2007
    Barham is located in southwestern NSW, approximately 805 km south west of Sydney. The town is located on the Murray River and is protected from flooding by a levee system...

  • Flood Project
    Visual Levee Audits

    Denman Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW

    Completed
    Publication date: 01/01/2007
    The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...

  • Flood Project
    Visual Levee Audits

    Darlington Point Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW

    Completed
    Publication date: 01/01/2007
    The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...

  • Flood Project
    Guidance, Tools and Resources

    Review and Assessment of Hydrologic/Hydraulic Flood Models

    Completed
    Publication date: 01/12/2006