26 Flood Projects found

Organisations: Moree Plains Shire Council

Filter Results
  • Flood Project
    Flood study

    Pallamallawa Northern Levee Second Design Review

    Completed
    Publication date: 11/04/2024
    Pallamallawa is subject to overland flow flooding caused by runoff from the local catchments to the north, northeast and east of town. An existing levee located in the north of...

  • Flood Project
    Levee reports

    Moree Flood Management Plan Recommendations Investigation

    Completed
    Publication date: 06/04/2022
    Dryside Engineering (DSE) in partnership with Water Modelling Solutions (WMS) were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from...

  • Flood Project
    Flood study

    Moree Flood Management Plan Recommendations Investigation

    Completed
    Publication date: 30/07/2021
    Dryside Engineering in partnership with Water Modelling Solutions were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from the peer...

  • Flood Project
    Concept Design

    Mungindi NSW Town Levee Investigation and Concept Design

    Completed
    Publication date: 01/07/2021
    The Mungindi NSW Town Levee Investigation and Concept Design report deals with the investigation and concept design of upgrade requirements for the earthen ring levee which...

  • Flood Project
    Flood study

    Pallamallawa Northern Levee Design Review

    Completed
    Publication date: 12/12/2018
    The Pallamallawa Floodplain Risk Management Study recommended that a levee be constructed around the northern side of the town to reduce the flood risk from the local catchment....

  • Flood Project
    Floodplain Risk Management Study

    Review of Moree and Environs Flood Study/Floodplain RIsk Management Study...

    Completed
    Publication date: 31/05/2017
    This is Volume 2 of the Review of Moree and Environs FS/FRMS&P - which is the Floodplain RIsk Management Study . It should be viewed in conjunction with Volume 1 (Flood...

  • Flood Project
    Flood study

    Review of Moree and Environs Flood Study / Floodplain Risk Management Study...

    Completed
    Publication date: 25/01/2017
    WRM Water & Environment Pty Ltd (WRM) was commissioned by Moree Plains Shire Council (MPSC) to review the Moree and Environs Flood Study/Floodplain Risk Management Study and...

  • Flood Project
    Floodplain Risk Management Plan

    Mungindi Floodplain Risk Management Plan

    Completed
    Publication date: 07/04/2015
    The general area of Mungindi is located within the Border Rivers catchment on the Barwon River floodplain. The town itself lies on the Carnarvon Highway, 120 km north-west of...

  • Flood Project
    Floodplain Risk Management Plan

    Boggabilla Floodplain Risk Management Plan

    Completed
    Publication date: 07/04/2015
    The general area of Boggabilla is located within the Border Rivers catchment on the Macintyre River floodplain. The town itself lies at the intersection of the Newell Highway...

  • Flood Project
    Floodplain Risk Management Study

    Mungindi Floodplain Risk Management Study (Draft)

    Completed
    Publication date: 31/01/2011
    The general area of Mungindi is located within the Border Rivers catchment on the Barwon River floodplain. The town itself lies on the Carnarvon Highway, 120 km north-west of...

  • Flood Project
    Floodplain Risk Management Study

    Boggabilla Floodplain Risk Management Study

    Completed
    Publication date: 31/05/2010
    Boggabilla is situated on the western bank of the Macintyre River and is subject to flooding from the river. The risk of flooding is considered high and the severity of flooding...

  • Flood Project
    Post event flood behaviour reports

    Mungindi Levee Flood Analysis

    Completed
    Publication date: 15/06/2009
    Mungindi is located on the Barwon River, on the New South Wales - Queensland border. That part of the township south of the river lies in the Moree Plains Shire Council Local...

  • Flood Project
    Guidance, Tools and Resources

    Moree Plains - Flood Mapping Atlas

    Completed
    Publication date: 01/03/2007
    Atlas map showcasing the Moree Plans Local Government Area and which parts are inundated, low hazard and high hazard. Flood contours are also visible.

  • Flood Project
    Floodplain Risk Management Study

    Pallamallawa Floodplain Management Study

    Completed
    Publication date: 04/09/2006
    Pallamallawa is situated on the northern bank of the Gwydir River and is subject to flooding from the river. The town is partially protected from Gwydir flooding by a levee that...

  • Flood Project
    Flood study

    Flood Study for Boomi

    Completed
    Publication date: 18/03/2004
    This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...

  • Flood Project
    Flood study

    Flood Study for Boggabilla

    Completed
    Publication date: 18/03/2004
    This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...

  • Flood Project
    Flood study

    Flood Study for Mungindi

    Completed
    Publication date: 18/03/2004
    This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...

  • Flood Project
    Flood study

    Flood Study For Garah

    Completed
    Publication date: 18/03/2004
    Garah is located within the Gil Gil Creek floodplain and has been subjected to various degrees of flooding over the years. It has a population of approximately 300 people and is...

  • Flood Project
    Flood study

    Pallamallawa Flood Study

    Completed
    Publication date: 18/03/2004
    This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of the...

  • Flood Project
    Guidance, Tools and Resources

    Pallamallawa - 1% Design Event (Moree Flood Study)

    Completed
    Publication date: 01/09/2003
    Illustrates the peak depths (metres) of the 1% AEP Design Event in Pallamallawa.