18 Flood Projects found

Organisations: Eurobodalla Shire Council

Filter Results
  • Flood Project
    Flood study

    Batemans Bay Urban Creeks Flood Study

    Completed
    Publication date: 01/07/2021
    The Batemans Bay Urban Creeks Flood Study has been prepared for Eurobodalla Shire Council (Council) to define the existing flood behaviour in the catchment and establish the...

  • Flood Project
    Flood study

    Flood Prone Access to Moruya Hospital - Flood Assessment and Murray Street...

    Completed
    Publication date: 24/02/2014
    The Moruya River Floodplain Management Plan (Issue 2) (ESC, 1999) identified overtopping of Murray Street at Gundary Creek Crossing as an impediment for residents to access...

  • Flood Project
    Guidance, Tools and Resources

    Moruya - Floodplain Code

    Completed
    Publication date: 10/07/2012
    The aim of this Code is to inform the community about Council’s requirements in relation to the use and development of land potentially affected by floods. The objectives are:...

  • Flood Project
    Flood study

    Moruya Flooding - Climate Change Assessment

    Completed
    Publication date: 14/04/2011
    The Moruya Township is located in south-east New South Wales, approximately 7 km upstream from the coast along the Moruya River. The Moruya River is the name of the estuarine...

  • Flood Project
    Guidance, Tools and Resources

    Eurobodalla Shire Council - Flood Risk Assessment Report

    Completed
    Publication date: 09/01/2006
    Flooding, either from mainstream or overland flows, is not a regular occurrence in the Eurobodalla Shire and many residents have not experienced flooding of any significant...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Reedy Creek, Malua Bay Floodplain Risk Management Study & Plan

    Completed
    Publication date: 21/04/2005
    The subject land covered by this study is within the Reedy Creek catchment at Malua Bay. Reedy Creek is located at Malua Bay approximately 9 km south of Batemans Bay on the...

  • Flood Project
    Flood study

    Lot 100 DP Flora Crescent, Batemans Bay - Flood Study

    Completed
    Publication date: 01/04/2004
    The site is located at Lot 100 DP 1001026 Flora Crescent, Batemans Bay. An open channel flows through the site from an existing stormwater basin in the southern section of the...

  • Flood Project
    Guidance, Tools and Resources

    Wagonga Inlet Flooding Investigation

    Completed
    Publication date: 01/04/2002
    The Study Area comprises Wagonga Inlet and its immediate surrounds, from the nearby coastal headlands including Bar Beach, up into the major tributaries of the Inlet. A key...

  • Flood Project
    Floodplain Risk Management Plan

    Moruya River Floodplain Management Plan (Issue No 2)

    Completed
    Publication date: 09/09/1999
    The Moruya River drains a catchment of some 1,500 square kilometres. In the main, the catchment is rugged and steep, rising to 1,000 metres above sea level only 40 kilometres...

  • Flood Project
    Flood study

    Flood Study Racecourse Creek, Moruya

    Completed
    Publication date: 01/02/1999
    This report contains the results of an investigation of flooding of the Princes Highway and South Head Road at Moruya, and the options available to reduce flooding. The study...

  • Flood Project
    Post event flood behaviour reports

    Moruya River - 1925 Flood Level Reports Summary

    Completed
    Publication date: 01/09/1992
    In May 1925, the area around Moruya suffered the most severe flooding since white settlement in the mid-1800s. The Moruya River overtopped the bridge and broke both banks...

  • Flood Project
    Post event flood behaviour reports

    Moruya River - Flooding 8-13th June 1991

    Completed
    Publication date: 01/11/1991
    Over the period 6 to 14 June, a low pressure system moving south from Queensland, and a high pressure system fairly stationary in the Tasman Sea directed humid easterly air onto...

  • Flood Project
    Guidance, Tools and Resources

    Moruya River - Flood Monitoring Procedures Manual

    Completed
    Publication date: 01/01/1990
    This manual has been prepared by the South Coast Regional Office of the Department of Public Works N.S.W. The manual sets out the procedures to be followed by Departmental...

  • Flood Project
    Guidance, Tools and Resources

    Joes Creek - Preliminary Flooding Assessment

    Completed
    Publication date: 01/05/1988
    The Joe's Creek catchment is located some 3km south east of the main centre of Batemans Bay. The creek drains a catchment area of 5.4 km2 rising from sea level at Corrigans...

  • Flood Project
    Guidance, Tools and Resources

    Bridge over Candlagan Creek - Design Report

    Completed
    Publication date: 01/09/1987
    At its meeting of 28 January 1986, The Eurobodalla Shire Council resolved that GHD be engaged to carry out the Engineering design for the new Candlagan Creek Bridge on the...

  • Flood Project
    Flood study

    Sandy Place Long Beach Bateman's Bay - Flood Study Calculations

    Completed
    Publication date: 03/10/1984
    The Department has examined aspects of flooding and ocean influences as requested by Council. In consideration of the above matters it is emphasised that regular maintenance of...

  • Flood Project
    Flood study

    Flood Study of Portion -232 Princes Highway, Ulladulla

    Completed
    Publication date: 01/05/1982
    The purpose of this study is to determine the estimated flood level that would occur for both a 1 in 100 year and 1 in 20 year storm on the abovementioned land (Portion 232,...

  • Flood Project
    Floodplain Risk Management Study

    Mogo - Floodplain Management Study

    Completed
    Publication date: 11/11/1111
    The first phase, the Mogo Flood Study, was prepared on Council's behalf by Willing and Partners Pty. Limited, Consulting Engineers. It is reproduced in Appendix C to this...