Batemans Bay Urban Creeks Flood Study
CompletedPublication date: 01/07/2021The Batemans Bay Urban Creeks Flood Study has been prepared for Eurobodalla Shire Council (Council) to define the existing flood behaviour in the catchment and establish the...
-
Flood ProjectFlood study
Flood Prone Access to Moruya Hospital - Flood Assessment and Murray Street...
CompletedPublication date: 24/02/2014The Moruya River Floodplain Management Plan (Issue 2) (ESC, 1999) identified overtopping of Murray Street at Gundary Creek Crossing as an impediment for residents to access...
-
Flood ProjectGuidance, Tools and Resources
Moruya - Floodplain Code
CompletedPublication date: 10/07/2012The aim of this Code is to inform the community about Council’s requirements in relation to the use and development of land potentially affected by floods. The objectives are:...
-
Flood ProjectFlood study
Moruya Flooding - Climate Change Assessment
CompletedPublication date: 14/04/2011The Moruya Township is located in south-east New South Wales, approximately 7 km upstream from the coast along the Moruya River. The Moruya River is the name of the estuarine...
-
Flood ProjectGuidance, Tools and Resources
Eurobodalla Shire Council - Flood Risk Assessment Report
CompletedPublication date: 09/01/2006Flooding, either from mainstream or overland flows, is not a regular occurrence in the Eurobodalla Shire and many residents have not experienced flooding of any significant...
-
Flood ProjectFloodplain Risk Management Study and Plan
Reedy Creek, Malua Bay Floodplain Risk Management Study & Plan
CompletedPublication date: 21/04/2005The subject land covered by this study is within the Reedy Creek catchment at Malua Bay. Reedy Creek is located at Malua Bay approximately 9 km south of Batemans Bay on the...
-
Flood ProjectFlood study
Lot 100 DP Flora Crescent, Batemans Bay - Flood Study
CompletedPublication date: 01/04/2004The site is located at Lot 100 DP 1001026 Flora Crescent, Batemans Bay. An open channel flows through the site from an existing stormwater basin in the southern section of the...
-
Flood ProjectGuidance, Tools and Resources
Wagonga Inlet Flooding Investigation
CompletedPublication date: 01/04/2002The Study Area comprises Wagonga Inlet and its immediate surrounds, from the nearby coastal headlands including Bar Beach, up into the major tributaries of the Inlet. A key...
-
Flood ProjectFloodplain Risk Management Plan
Moruya River Floodplain Management Plan (Issue No 2)
CompletedPublication date: 09/09/1999The Moruya River drains a catchment of some 1,500 square kilometres. In the main, the catchment is rugged and steep, rising to 1,000 metres above sea level only 40 kilometres...
-
Flood ProjectFlood study
Flood Study Racecourse Creek, Moruya
CompletedPublication date: 01/02/1999This report contains the results of an investigation of flooding of the Princes Highway and South Head Road at Moruya, and the options available to reduce flooding. The study...
-
Flood ProjectPost event flood behaviour reports
Moruya River - 1925 Flood Level Reports Summary
CompletedPublication date: 01/09/1992In May 1925, the area around Moruya suffered the most severe flooding since white settlement in the mid-1800s. The Moruya River overtopped the bridge and broke both banks...
-
Flood ProjectPost event flood behaviour reports
Moruya River - Flooding 8-13th June 1991
CompletedPublication date: 01/11/1991Over the period 6 to 14 June, a low pressure system moving south from Queensland, and a high pressure system fairly stationary in the Tasman Sea directed humid easterly air onto...
-
Flood ProjectGuidance, Tools and Resources
Moruya River - Flood Monitoring Procedures Manual
CompletedPublication date: 01/01/1990This manual has been prepared by the South Coast Regional Office of the Department of Public Works N.S.W. The manual sets out the procedures to be followed by Departmental...
-
Flood ProjectGuidance, Tools and Resources
Joes Creek - Preliminary Flooding Assessment
CompletedPublication date: 01/05/1988The Joe's Creek catchment is located some 3km south east of the main centre of Batemans Bay. The creek drains a catchment area of 5.4 km2 rising from sea level at Corrigans...
-
Flood ProjectGuidance, Tools and Resources
Bridge over Candlagan Creek - Design Report
CompletedPublication date: 01/09/1987At its meeting of 28 January 1986, The Eurobodalla Shire Council resolved that GHD be engaged to carry out the Engineering design for the new Candlagan Creek Bridge on the...
-
Flood ProjectFlood study
Sandy Place Long Beach Bateman's Bay - Flood Study Calculations
CompletedPublication date: 03/10/1984The Department has examined aspects of flooding and ocean influences as requested by Council. In consideration of the above matters it is emphasised that regular maintenance of...
-
Flood ProjectFlood study
Flood Study of Portion -232 Princes Highway, Ulladulla
CompletedPublication date: 01/05/1982The purpose of this study is to determine the estimated flood level that would occur for both a 1 in 100 year and 1 in 20 year storm on the abovementioned land (Portion 232,...
-
Flood ProjectFloodplain Risk Management Study
Mogo - Floodplain Management Study
CompletedPublication date: 11/11/1111The first phase, the Mogo Flood Study, was prepared on Council's behalf by Willing and Partners Pty. Limited, Consulting Engineers. It is reproduced in Appendix C to this...