-
Flood ProjectGuidance, Tools and Resources
Revised 2016 Design Rainfalls Investigations into the need for and Derivation...
CompletedPublication date: 26/07/2018In 2016, a revision of Australian Rainfall and Runoff was released with updated IFD design rainfalls. The IFDs were derived using more data and modern methods than previous...
-
Flood ProjectPost event data collection
Flood Data Collection, Dungog and Stroud - Flood Event 21 April 2015
CompletedPublication date: 29/05/2015This report has been prepared for the New South Wales Office of Environment and Heritage by Paterson Consultants Pty Ltd, Grafton. Severe floods were recorded on Tuesday, 21...
-
Flood ProjectFloodplain Risk Management Study
Floodplain Risk Management Study for Silverton
CompletedPublication date: 07/01/2014Silverton is located approximately 25 kilometres north-west of Broken Hill and is accessible by sealed road. The central urban area is a typical grid pattern running in a...
-
Flood ProjectGuidance, Tools and Resources
Gwydir Valley - Annual Environmental Watering Plan 2012-2013
CompletedPublication date: 01/10/2012The Gwydir Valley Annual Environmental Watering Plan 2012-13 outlines the objectives and potential actions for environmental water delivery in the Gwydir catchment for the...
-
Flood ProjectPost event flood behaviour reports
Hay to Maude - Flood Gaugings - March/April 2012
CompletedPublication date: 01/03/2012Information on flow measurement gaugings and or/height data collected from the NSW Office of Water Gauging stations at Hay, Maude, Carrathool and Darlington Point. This includes...
-
Flood ProjectFloodplain Risk Management Plan
Warrah Creek - Floodplain Management Plan
CompletedPublication date: 01/02/2012The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...
-
Flood ProjectFloodplain Risk Management Plan
Lachlan River Jemalong Gap to Condobolin - Floodplain Management Plan
CompletedPublication date: 01/02/2012The FMP has been prepared to provide strategic guidance to NSW government agencies and landholders in the management of floodwaters on the Lachlan River (Jemalong Gap to...
-
Flood ProjectPost event flood behaviour reports
Northern Rivers NSW - Flood Summary May 2009
CompletedPublication date: 28/02/2011This report was commissioned by the New South Wales Department of Environment, Climate Change and Water (DECCW) in collaboration with State Emergency Service (SES) to summarise...
-
Flood ProjectFloodplain Risk Management Study and Plan
Edward and Niemur Rivers Stage 3: Moama-Moulamein Railway to Liewah and Malla...
CompletedPublication date: 01/01/2011This Stage 3 floodplain management plan (Stage 3 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...
-
Flood ProjectFloodplain Risk Management Plan
Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Managemen...
CompletedPublication date: 01/01/2011This Stage 2 floodplain management plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...
-
Flood ProjectFloodplain Risk Management Plan
Billabong Creek: Walbundrie to Jerilderie Floodplain Management Plan - Flood ...
CompletedPublication date: 01/12/2010The Billabong Creek floodplain management plan (FMP) was gazetted in July 2006. The FMP applies to the Billabong Creek floodplain between Walbundrie and downstream of...
-
Flood ProjectFloodplain Risk Management Plan
Moomin Creek - Floodplain Management Plan
CompletedPublication date: 01/10/2010The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...
-
Flood ProjectGuidance, Tools and Resources
Floristic Assessment of the Lower Macquarie River
CompletedPublication date: 01/09/2010This report describes the results of a floristic assessment of the lower Macquarie River. The floristic assessment was undertaken along the Macquarie River from the end of the...
-
Flood ProjectFloodplain Risk Management Plan
Report for Edward & Wakool Rivers - Stage 1 Floodplain Management Plan: Balpo...
CompletedPublication date: 27/07/2010This report documents the results of investigations to assess hydraulic impacts associated with flood control works on the Balpool Station property at Balpool. The property is...
-
Flood ProjectFloodplain Risk Management Study
Lachlan River Floodplain Risk Management Study (Gooloogong to Jemalong Gap)
CompletedPublication date: 01/04/2010The study area for the draft FMP incorporates the floodplain area covered by the 1979 Guidelines. It extends from Gooloogong in the east to Jemalong Gap in the Jemalong Range in...
-
Flood ProjectGuidance, Tools and Resources
NSW Floodplain Risk Management Database Scoping Study
CompletedPublication date: 01/04/2008The Department of Environment and Climate Change (DECC) is considering the development of a database containing information relating to floodplain risk management (FRM) to...
-
Flood ProjectVisual Levee Audits
Barham Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/02/2007Barham is located in southwestern NSW, approximately 805 km south west of Sydney. The town is located on the Murray River and is protected from flooding by a levee system...
-
Flood ProjectVisual Levee Audits
Darlington Point Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/01/2007The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...
-
Flood ProjectGuidance, Tools and Resources
Review and Assessment of Hydrologic/Hydraulic Flood Models
CompletedPublication date: 01/12/2006The Department of Natural Resources (DNR) has engaged the NSW Department of Commerce's Manly Hydraulics Laboratory (MHL) to prepare a report summarising the features,...
-
Flood ProjectVisual Levee Audits
Singleton Levee - Visual Audit of Urban Levee
CompletedPublication date: 01/07/2006Singleton Levee Audit. As part of Visual Audit of Urban Levees on Non Tidal Areas of NSW. Singleton is located in the Hunter Valley, approximately 235 km north of Sydney. The...