-
Flood ProjectConcept Design
Puzzle Flat Creek Levee Upgrade Concept Design Report
CompletedPublication date: 28/06/2017A design report has been completed as part of a proposed upgrade for the existing levee at Puzzle Flat Creek located to the east of Eugowra. The upgrade is necessary to reduce...
-
Flood ProjectFloodplain Risk Management Study
Review of Molong Floodplain Risk Management Study
CompletedPublication date: 06/05/2011This chapter details the review undertaken by URS of the Flood Study for Molong prepared by the NSW Department of Land and Water Conservation. The detailed flood study as...
-
Flood ProjectFloodplain Risk Management Study
Review of Eugowra Floodplain Risk Management Study 1999
CompletedPublication date: 01/03/2010The review of the Floodplain Risk Management Study (FRMS) for Eugowra which had been prepared by Lyall and Macoun Consulting Engineers (LMCE, 1999) involved the following...
-
Flood ProjectFloodplain Risk Management Study and Plan
Canowindra Flood and Floodplain Risk Management Study and Plan (Draft)
CompletedPublication date: 01/10/2007The town of Canowindra is located on the Belubula River, a major tributary of the Lachlan River. The Belubula River rises in high country to the east of Blaney at elevations of...
-
Flood ProjectFlood study
Canowindra Flood Study
CompletedPublication date: 01/02/2004The study area includes the Belubula River and its floodplain from 0.5km upstream of Cherry Tree Falls Bridge on Mandurama Road (MR 7511) to 1km downstream of the former Cowra...
-
Flood ProjectFloodplain Risk Management Study
Eugowra Floodplain Management Study
CompletedPublication date: 04/08/1999Cabonne Council commissioned this Floodplain Management Study in accordance with the procedures set out in the NSW Government's current Floodplain Development Manual. This...
-
Flood ProjectFloodplain Risk Management Study
Molong Floodplain Management Study
CompletedPublication date: 01/01/1999This study investigates floodplain management issues for the village of Molong within the Cabonne local government area. Molong is situated adjacent to Molong Creek in the...
-
Flood ProjectGuidance, Tools and Resources
Belubula River - Stream Clearing Investigation
CompletedPublication date: 01/09/1984This report covers the results of an investigation of possible stream clearing works to reduce flooding on the Belubula River, undertaken during September 1984. Some 36 km of...