-
Flood ProjectFlood Warning Reports
Upper Lachlan Shire Total Flood Warning System
CompletedPublication date: 10/01/2023The overall objective of the project is to design, document, and implement cost effective, fit for purpose flood warning systems for the Villages of Crookwell, Taralga, Gunning,...
-
Flood ProjectFloodplain Risk Management Study and Plan
Ungarie Floodplain Risk Management Study and Plan
CompletedPublication date: 01/06/2020Ungarie has experienced several major historical flood events, including March 2012 and June 2016. To understand and manage flood risk to the town and catchment, council...
-
Flood ProjectFlood study
Forbes Flood Study Review
CompletedPublication date: 01/05/2020The study objectives were to review and update the findings of previous flooding investigations that have been carried out for Forbes. This included the update of flood...
-
Flood ProjectConcept Design
Young Stormwater Upgrade Scheme
CompletedPublication date: 01/11/2019This report sets out the findings of an investigation which was undertaken to refine the design of the elements comprising the Combined Trunk Drainage Upgrade Scheme ( the...
-
Flood ProjectFlood study
Temora Flood Study
CompletedPublication date: 14/06/2019The Temora Flood Study was commissioned by Temora Shire Council and the NSW state government to define the existing flood behaviour in the township of Temora; including the open...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lachlan River (Condobolin) Floodplain Risk Management Study and Plan
CompletedPublication date: 11/11/2018Study Objectives Lachlan Shire Council commissioned the Floodplain Risk Management Study and Draft Plan for the town of Condobolin. The overall objectives of the Floodplain...
-
Flood ProjectFloodplain Risk Management Study and Plan
Boorowa Floodplain Risk Management Study and Plan
CompletedPublication date: 01/03/2018Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study...
-
Flood ProjectConcept Design
Puzzle Flat Creek Levee Upgrade Concept Design Report
CompletedPublication date: 28/06/2017A design report has been completed as part of a proposed upgrade for the existing levee at Puzzle Flat Creek located to the east of Eugowra. The upgrade is necessary to reduce...
-
Flood ProjectFlood study
Ungarie Flood Study
CompletedPublication date: 03/05/2017The Ungarie Flood Study has been prepared for Bland Shire Council to define the existing flood behaviour in the township of Ungarie and establish the basis for subsequent...
-
Flood ProjectFlood study
Boorowa Flood Study
CompletedPublication date: 01/03/2017The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...
-
Flood ProjectFlood study
Blayney Flood Study
CompletedPublication date: 15/06/2015The Town of Blayney is located in the Central West region of New South Wales approximately 240km west of Sydney in the Blayney Shire Council area. Blayney Township (population...
-
Flood ProjectGuidance, Tools and Resources
O'Brien Tributary Drainage Improvements
CompletedPublication date: 01/04/2015Weddin Shire Council issued the Brief for the design of improvements to the stormwater drainage system of the O’Brien Tributary at the Oliver Court residential unit development...
-
Flood ProjectFlood study
Trundle Flood Study
CompletedPublication date: 23/10/2014Trundle is a rural community situated 60km north-west of Parkes in New South Wales. Trundle township experiences frequent flooding from Yarrabandai and Goobang Creeks and...
-
Flood ProjectFloodplain Risk Management Study and Plan
Young Floodplain Risk Management Study and Plan
CompletedPublication date: 01/05/2014Young Shire Council commissioned the Floodplain Risk Management Study and Plan for the town of Young. The overall objectives of the Floodplain Risk Management Study (FRMS) were...
-
Flood ProjectFlood study
The Town of Young Flood Study
CompletedPublication date: 01/03/2014This report presents the results of the investigation of flooding in the Burrangong Creek catchment at Young, which has been prepared for Young Shire Council (YSC) with the...
-
Flood ProjectFlood study
The Village of Taralga Flood Study
CompletedPublication date: 01/02/2014Taralga has a population of about 350 and is located on Corroboree Creek which flows in a north-easterly direction through the village area. It drains a small tributary...
-
Flood ProjectFlood study
The Village of Gunning Flood Study
CompletedPublication date: 01/02/2014The Village of Gunning has a population of about 550 and is located on the Hume Highway midway between Yass and Goulburn in the headwaters of the Lachlan Valley. Meadow Creek...
-
Flood ProjectFlood study
The Village of Crookwell Flood Study
CompletedPublication date: 01/02/2014The village of Crookwell has a population of about 2,200 and is located about 45 km north of Goulburn on the Crookwell Road. The village is located in the headwaters of the...
-
Flood ProjectFlood study
The Village of Collector Flood Study
CompletedPublication date: 01/02/2014Collector has a population of about 150 and is located on the western side of the Federal Highway in the catchment of Collector Creek, which drains an area of about 140 square...
-
Flood ProjectFlood study
Cowra Overland Flood Study and Plan
CompletedPublication date: 31/10/2013Overland flooding has been identified as a problem for a number of private properties in Cowra. An assessment of overland flooding was undertaken for two local catchments in...