Flood ProjectFlood Warning Reports
Pending Esk River Flood Monitoring Project
CompletedPublication date: 11/03/2024Installation of a remotely monitored flood gauge on the Esk River Bridge and flood warning signs at Woombah and Iluka villages along Iluka Rd. Inclusions of flashing ‘closed’...
-
Flood ProjectFlood study
Pending Forster/Tuncurry Flood Study
CompletedPublication date: 01/09/1989This flood study used hydrologic and 1D hydraulic modelling to assess flood behaviour for the 5%, 2% and 1% AEP flood as well as an extreme flood. The model was calibrated to...
-
Flood ProjectFlood study
Pending Stroud Flood Study 1986
CompletedPublication date: 01/06/1986This flood study is what was called a 'reconnaissance flood study' by the Water Resources Commission at the time. This was a flood study proposed for smaller towns, or towns...
-
Flood ProjectFlood study
Pending Wallamba River Flood Study 1983
CompletedPublication date: 01/11/1983This flood study was undertaken by the NSW Public Works Department to enable flood prone land from riverine flooding to be identified. A 1D modelw as used to calculate flood...
-
Flood ProjectFlood study
Pending Manning River Valley - Report on Flood Problems
CompletedPublication date: 25/07/1983This report was prepared for a steering committee comprising representatives of Commonwealth, State and Local Government bodies. It is one of three reports dealing with flooding...
-
Flood ProjectFloodplain Risk Management Study
Pending Manning RIver Valley Flood Mitigation Works Recommended
CompletedPublication date: 01/07/1965This study was in response to a representation made to the Minister of Public Works by the Lower Manning River residents. Investigations into flood heights and behaviours were...
-
Flood ProjectFlood study
Pending Moonee Creek Flood Study 2025
DraftPublication date: 26/03/2025Moonee Creek Flood Study undertaken by JB Pacific
-
Flood ProjectFlood study
CTP - Sydney Olympic Park Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - Burwood North Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - North Strathfield Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - Five Dock Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - The Bays Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only remain valid until the follow-on contractors commence...
-
Flood ProjectFlood study
Redbank Creek Flood Study
CompletedPublication date: 17/04/2025The Redbank Creek Flood Study focuses on the Redbank Creek catchment and the township of North Richmond, located within the Hawkesbury Local Government Area (LGA), approximately...
-
Flood ProjectDam Safety Plan
Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan
CompletedPublication date: 09/04/2025Annual update of Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan - March 2025
-
Flood ProjectFloodplain Risk Management Study and Plan
Willinga Lake Flood Study and Floodplain Risk Management Study & Plan 2025
CompletedPublication date: 25/03/2025Council engaged Worley Consulting to undertake the Willinga Lake Flood Study and Floodplain Risk Management Study and Plan (FRMS&P). Willinga Lake is located within the...
-
Flood ProjectFlood study
Clyde River Flood Study and Floodplain Risk Management Study
CompletedPublication date: 19/03/2025Completion of a Flood Study and Floodplain Risk Management Study and Plan for the Clyde River wihin the Shoalhaven LGA. Hydrological and hydraulic models have been extend to the...
-
Flood ProjectFloodplain Risk Management Study and Plan
Hay and Maude Flood Study and Flood Risk Management Study and Plan
CompletedPublication date: 01/03/2025Hay Shire Council (Council) commissioned the preparation of a Flood Study and Flood Risk Management Study and Plan for the township of Hay and the village of Maude. The...
-
Flood ProjectFlood study
Coolamon Flood Study
CompletedPublication date: 01/03/2025The objective of the study was to define the nature of the following two types of flooding that are experienced at the township of Coolamon for flood frequencies ranging between...
-
Flood ProjectFlood study
Tocumwal and Barooga Flood Study
CompletedPublication date: 17/02/2025The Flood Study provides information to improve the understanding of flood behaviour and impacts in the study area, which includes the towns of Tocumwal and Barooga, as well as...
-
Flood ProjectFlood study
North Creek Warners Bay Flood Study (Final Report) January 2025
CompletedPublication date: 25/01/2025Catchment description Study Area and Catchment Details The study area comprises the entire North Creek catchment, located on the northern hinterland of Lake Macquarie. The...