1,470 Flood Projects found

Filter Results
  • Flood Project
    Guidance, Tools and Resources

    NSW Flood Investigation Brief Development Tool and Associated Files

    Completed
    Publication date: 08/12/2023
    The purpose of this tool is to produce a generic flood investigation brief document in accordance with the requirements of the NSW Government Flood Program. The tool should be...

  • Flood Project
    Flood study

    Coffs Harbour Northern LGA FLood Study

    Completed
    Publication date: 01/11/2023
    Flood study including Corindi River, Arrawarra, Darkum, Willis, Double Crossing (Hearnes Lake) and Fiddamans Creeks

  • Flood Project
    Floodplain Risk Management Study

    Woy Woy Floodplain Risk Management Study

    Completed
    Publication date: 15/08/2023
    Floodplain Risk Management Study of Woy Woy Peninsula including Kahibah Creek catchment.

  • Flood Project
    Post event data collection

    NSW COAST FLOOD SUMMARY FEBRUARY/MARCH 2022

    Completed
    Publication date: 15/08/2023
    The NSW coast experienced flooding in February/March 2022 due to significant rainfall events. The aim of this report is to provide a snapshot of the intensity of flooding...

  • Flood Project
    Flood study

    Singleton LGA Floodplain Risk Management Study and Plan

    Completed
    Publication date: 02/08/2023
    Singleton LGA Floodplain Risk Management Study and Plan

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lithgow Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2023
    Lithgow City Council commissioned the preparation of a contemporaneous floodplain risk management study and plan for Lithgow and its immediate environs. The overall objectives...

  • Flood Project
    Flood study

    Greendale Creek Flood Study

    Completed
    Publication date: 28/07/2023
    The Greendale Creek Flood Study catchment area is located within the Northern Beaches Council Local Government Area. The study area includes parts of the suburbs of Beacon Hill,...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Towradgi Creek FS, FRMS&P 2023

    Completed
    Publication date: 05/07/2023
    Towradgi Creek is located within the Wollongong City Council Local Government Area (LGA). The 7.5km 2 catchment incorporates the northern Wollongong suburbs of Tarrawanna,...

  • Flood Project
    Guidance, Tools and Resources

    NSW Flood damage assessment tool (DT01)

    Completed
    Publication date: 03/07/2023
    The purpose of this tool is to calculate damages associated with flooding and facilitate cost benefit assessments of potential floodplain risk management measures. The tool has...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Cootamundra Floodplain Risk Management Study and Plan

    Completed
    Publication date: 15/06/2023
    Cootamundra Floodplain Risk Management Study and Plan considered and assessed a range of options for the management of existing and future flood risk in Cootamundra. A series...

  • Flood Project
    Flood study

    Narrabri Floodplain Risk Management Study and Plan 2023

    Completed
    Publication date: 30/05/2023
    WRM was commissioned by Narrabri Shire Council to prepare the Narrabri Floodplain Risk Management Study and Plan (FRMP) . The study included a supplementary Flood Study to...

  • Flood Project
    Flood study

    Cooks River Catchment Flood Study - Stage 1

    Completed
    Publication date: 10/05/2023
    The Cooks River catchment is a major watershed within Sydney, draining some 103 km2 and is home to 560,265 people (ABS, 2020). As such, Cooks River is a key catchment in terms...

  • Flood Project
    Flood study

    DARLING RIVER FLOOD MAPPING STUDY

    Completed
    Publication date: 28/04/2023
    Manly Hydraulic Laboratory (MHL) and Public Works Advisory (PWA) were engaged by Central Darling Shire Council (CDSC) to undertake the Darling River Flood Mapping Study. The...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Mullet Creek Floodplain Risk Management Study and Plan

    Completed
    Publication date: 05/04/2023
    The Mullet Creek Floodplain Risk Management Plan (FRMP) has been prepared for Wollongong City Council (hereafter referred to as Council) in accordance with the New South Wales...

  • Flood Project
    Flood study

    Bimbi Flood Study Final Report Volume 2

    Completed
    Publication date: 16/03/2023
    Bimbi Flood Study

  • Flood Project
    Floodplain Risk Management Study

    Bimbi Village Flood Risk Management Study and Plan Final Report

    Completed
    Publication date: 16/03/2023
    Bimbi is located in the Central West NSW with a population of 114 people, according to the 2016 Australian Bureau of Statistics Census. It predominately consists of rural...

  • Flood Project
    Flood study

    Campbelltown Southern Catchments Flood Study

    Completed
    Publication date: 10/03/2023
    The Campbelltown Southern Catchments Flood Study covers an area of 10.2 km2 within the Campbelltown City Council Local Government Area (LGA). The study area incorporates the...

  • Flood Project
    Flood study

    Cabravale Overland Flood Study

    Completed
    Publication date: 24/02/2023
    The Cabravale Overland Flow Flood Study was prepared for Fairfield City Council to define overland flood behaviour across the 11.5 km2 Cabravale study area. The flood study was...

  • Flood Project
    Flood study

    Wyalong and West Wyalong Flood Study

    Completed
    Publication date: 02/02/2023
    Study Objective The objective of the Wyalong and West Wyalong Flood Study was to define the nature of both Main Stream Flooding and Major Overland Flow at the twin towns of...

  • Flood Project
    Floodplain Risk Management Study

    Wianamatta South Creek Cumulative Impact Assessment (Rev E)

    Completed
    Publication date: 24/01/2023
    In recognition of the significant development pressures in the Wianamatta South Creek catchment, this Cumulative Impact Assessment was commissioned to inform Infrastructure NSW,...