Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

1,403 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Eumungerie Floodplain Risk Management Study and Plan and Flood Study Update

    Completed
    Publication date: 14/04/2022
    Estimated design discharges and flood levels for the Village of Eumungerie from Drillwarrina Creek, Coolbaggie Creek and local catchment sources. Investigated a range of flood...

  • Flood Project
    Levee reports

    Moree Levee Feasibility Study

    Completed
    Publication date: 06/04/2022
    Gridded model results of updated design modelling undertaken during completion of the Moree Levee Feasibility Study

  • Flood Project
    Floodplain Risk Management Study and Plan

    Davistown and Empire Bay Floodplain Risk Management Study

    Completed
    Publication date: 31/03/2022
    Study Area Davistown and Empire Bay catchments are sub‐catchments of the Brisbane Water Estuary, which connects to Broken Bay Flood Risk The study area can be impacted by three...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Little Creek Catchment Floodplain Risk Management Study and Plan

    Completed
    Publication date: 21/02/2022
    Introduction Catchment Simulation Solutions has been commissioned to prepare the Little Creek Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...

  • Flood Project
    Flood study

    Wingecarribee River Flood Study Update

    Completed
    Publication date: 18/02/2022
    Handover data for the February 2022 update to the Wingecarribee River Flood Study. Datasets include: - Data Compendium - GIS Layers - Hydraulic Model Files - Hydrologic Model...

  • Flood Project
    Floodplain Risk Management Study and Plan

    North Brother Local Catchments Floodplain Risk Management Study and Plan

    Completed
    Publication date: 16/12/2021
    A floodplain risk management study of the North Brother Local Catchments area. The study area is located on the Mid North Coast of NSW, and includes parts of the villages of...

  • Flood Project
    Flood study

    Middle Creek Flood Study and Floodplain Risk Managment Study and Plan (2021)

    Completed
    Publication date: 01/12/2021
    The Middle Creek Flood Study provides a new flood model that incorporates advances in numerical modelling techniques and technology, updated topographic survey (e.g. LiDAR) and...

  • Flood Project
    Flood study

    Hunters Hill LGA Flood Study

    Completed
    Publication date: 21/11/2021
    A flood study covering the Hunters Hill LGA in Sydney, undertaken as part of the NSW Floodplain Management Program. The study includes historical and design flood events, and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Darlington Point Floodplain Risk Management Study and Plan

    Completed
    Publication date: 27/10/2021
    Floodplain Risk Management Study and Plan for Darlington Point, which is located on the floodplain of the Murrumbidgee River. The overall goal of the Floodplain Risk Management...

  • Flood Project
    Flood study

    Bonalbo Flood Study

    Completed
    Publication date: 21/10/2021
    The Bonalbo Flood Study has been prepared under the Floodplain Risk Management Process to develop a detailed understanding of the flood behaviour at Bonalbo from both Peacock...

  • Flood Project
    Flood study

    Lurline Bay, Matraville, Malabar & Yarra Bay Flood Study

    Completed
    Publication date: 13/10/2021
    The Lurline Bay, Matraville, Malabar & Yarra Bay Flood Study covers an area of 9.6 km2 within the southern sections of the Randwick City Council Local Government Area (LGA)....

  • Flood Project
    Flood study

    Millards Creek Flood Study

    Completed
    Publication date: 20/09/2021
    Flood study for the Millards Creek catchment located in Southern NSW within the Shoalhaven City Council LGA.

  • Flood Project
    Flood study

    Currarong Creek Flood Study

    Completed
    Publication date: 20/09/2021
    Detailed flood study of the Currarong Creek catchment which is located in southern NSW within the Shoalhaven City Council LGA.

  • Flood Project
    Flood study

    Lake Macquarie Catchments Overland Flood Study

    Completed
    Publication date: 31/08/2021
    Study Ojectives This flood study establishes design flood event conditions, including consideration of the potential impact of climate change. Study Location The study area...

  • Flood Project
    Floodplain Risk Management Study

    Flood Studies for Eight Residual Lake Macquarie Waterway Tributary Catchments

    Completed
    Publication date: 23/08/2021
    Study Areas Lake Macquarie City Council identified eight remaining smaller tributary catchments which have not been investigated in previous studies. These eight smaller...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Bellinger and Kalang Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2021
    This Floodplain Risk Management Study and Plan was developed by WMAWater for Bellingen Shire Council. The aims of the study were to: assess hazard and hydraulic hazard and...

  • Flood Project
    Flood study

    Moree Flood Management Plan Recommendations Investigation

    Completed
    Publication date: 30/07/2021
    Dryside Engineering in partnership with Water Modelling Solutions were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from the peer...

  • Flood Project
    Flood study

    Murrumbateman, Bowning, Bookham and Binalong Flood Study – Addendum Report

    Completed
    Publication date: 21/07/2021
    The Murrumbateman, Bowning, Bookham and Binalong Flood Study – Addendum Report deals with the development of flood planning constraint category maps for the villages of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Gulargambone Floodplain Risk Management Study and Plan

    Completed
    Publication date: 07/07/2021
    The Study Area for Gulargambone is located at the confluence of the Castlereagh River (catchment area 7,000 km2 at the confluence) and Gulargambone Creek (catchment area 600 km2...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Quambone Floodplain Risk Management Study and Plan

    Completed
    Publication date: 07/07/2021
    Quambone (population 247 and 50 dwellings) is located approximately 55 km west of Coonamble, in the Central West Region of NSW. The Village of Quambone, declared on 28 July...