Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

1,457 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study

    Woy Woy Floodplain Risk Management Study

    Completed
    Publication date: 15/08/2023
    Floodplain Risk Management Study of Woy Woy Peninsula including Kahibah Creek catchment.

  • Flood Project
    Flood study

    Singleton LGA Floodplain Risk Management Study and Plan

    Completed
    Publication date: 02/08/2023
    Singleton LGA Floodplain Risk Management Study and Plan

  • Flood Project
    Guidance, Tools and Resources

    NSW Flood damage assessment tool (DT01)

    Completed
    Publication date: 03/07/2023
    The purpose of this tool is to calculate damages associated with flooding and facilitate cost benefit assessments of potential floodplain risk management measures. The tool has...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Cootamundra Floodplain Risk Management Study and Plan

    Completed
    Publication date: 15/06/2023
    Cootamundra Floodplain Risk Management Study and Plan considered and assessed a range of options for the management of existing and future flood risk in Cootamundra. A series...

  • Flood Project
    Flood study

    Narrabri Floodplain Risk Management Study and Plan 2023

    Completed
    Publication date: 30/05/2023
    WRM was commissioned by Narrabri Shire Council to prepare the Narrabri Floodplain Risk Management Study and Plan (FRMP) . The study included a supplementary Flood Study to...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Mullet Creek Floodplain Risk Management Study and Plan

    Completed
    Publication date: 05/04/2023
    The Mullet Creek Floodplain Risk Management Plan (FRMP) has been prepared for Wollongong City Council (hereafter referred to as Council) in accordance with the New South Wales...

  • Flood Project
    Floodplain Risk Management Study

    Bimbi Village Flood Risk Management Study and Plan Final Report

    Completed
    Publication date: 16/03/2023
    Bimbi is located in the Central West NSW with a population of 114 people, according to the 2016 Australian Bureau of Statistics Census. It predominately consists of rural...

  • Flood Project
    Flood study

    Bimbi Flood Study Final Report Volume 2

    Completed
    Publication date: 16/03/2023
    Bimbi Flood Study

  • Flood Project
    Flood study

    Campbelltown Southern Catchments Flood Study

    Completed
    Publication date: 10/03/2023
    The Campbelltown Southern Catchments Flood Study covers an area of 10.2 km2 within the Campbelltown City Council Local Government Area (LGA). The study area incorporates the...

  • Flood Project
    Flood study

    Cabravale Overland Flood Study

    Completed
    Publication date: 24/02/2023
    The Cabravale Overland Flow Flood Study was prepared for Fairfield City Council to define overland flood behaviour across the 11.5 km2 Cabravale study area. The flood study was...

  • Flood Project
    Flood study

    Wyalong and West Wyalong Flood Study

    Completed
    Publication date: 02/02/2023
    Study Objective The objective of the Wyalong and West Wyalong Flood Study was to define the nature of both Main Stream Flooding and Major Overland Flow at the twin towns of...

  • Flood Project
    Floodplain Risk Management Study

    Wianamatta South Creek Cumulative Impact Assessment (Rev E)

    Completed
    Publication date: 24/01/2023
    In recognition of the significant development pressures in the Wianamatta South Creek catchment, this Cumulative Impact Assessment was commissioned to inform Infrastructure NSW,...

  • Flood Project
    Flood Warning Reports

    Upper Lachlan Shire Total Flood Warning System

    Completed
    Publication date: 10/01/2023
    The overall objective of the project is to design, document, and implement cost effective, fit for purpose flood warning systems for the Villages of Crookwell, Taralga, Gunning,...

  • Flood Project
    Concept Design

    Investigation and Concept Design of Ursula Road Scheme, Bulli

    Completed
    Publication date: 19/12/2022
    The ‘Combined Catchment of Whartons, Collins and Farrahars Creeks, Bellambi Gully and Bellambi Lake Floodplain Risk Management Study and Plan’ was prepared in 2014 and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Bourke Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/12/2022
    Bourke Shire Council (Council__) commissioned the preparation of the Bourke Flood Study_ and the Bourke Floodplain Risk Management Study and Plan (___Bourke FRMS&P) for the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Nepean River Floodplain Risk Management Study and Plan 2022

    Completed
    Publication date: 13/11/2022
    The study is to develop a Floodplain Risk Management Study and Plan (FRMSP) for the Nepean River catchment that addresses the existing, future and continuing flood problems,...

  • Flood Project
    Flood study

    Lower Shoalhaven River Flood Study 2022

    Completed
    Publication date: 09/11/2022
    Shoalhaven City Council engaged Cardno (now Stantec) to assist with the preparation of the Lower Shoalhaven Flood Study. Previous flood information available for the catchment...

  • Flood Project
    Flood study

    Bimbi Flood Study Final Report

    Completed
    Publication date: 07/11/2022
    Bimbi is located in the Weddin Shire Council Local Government Area (LGA) in Central West NSW. According to the 2016 Australian Bureau of Statistics Census, the suburb of Bimbi...

  • Flood Project
    Flood study

    Review of Upper South Creek Flood Study in the Context of Ongoing Development

    Completed
    Publication date: 25/10/2022
    The Review of Upper South Creek Flood Study was prepared for Camden Council to provide information about the existing flood risk in the upper South Creek catchment. The study...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Geurie Floodplain Risk Management Study and Plan 2022

    Completed
    Publication date: 10/10/2022
    The Geurie Floodplain Risk Management Study and Plan (FRMS&P) was prepared for Dubbo Regional Council and the NSW state government. The study area focused on the township of...