-
Flood ProjectFloodplain Risk Management Study and Plan
Flat Rock Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 18/12/2020The main objective of this Floodplain Risk Management Study and Plan is to identify floodplain risk, analyse floodplain strategies for the management of risk and to put forward...
-
Flood ProjectFlood study
Exile Bay Catchment Flood Study
CompletedPublication date: 07/12/2020The Exile Bay catchment covers a 345 hectare area with elevations that range from approximately 33m AHD to sea level at the Saltwater Creek channel and then discharges into...
-
Flood ProjectDetailed Design
Detailed Design Report - West Street Swale
CompletedPublication date: 03/12/2020Detailed Design - West Street Swale, Russell Vale
-
Flood ProjectConcept Design
Concept Design Report - Bellambi Gully Channel Improvement Works Between the ...
CompletedPublication date: 27/11/2020Concept Design of Bellambi Gully Scheme, Channel, culvert and pipe works downstream of Pioneer Road, Bellmabi
-
Flood ProjectFlood study
Wianamatta (South) Creek Catchment Flood Study - Existing Conditions
CompletedPublication date: 25/11/2020The Wianamatta (South) Creek Catchment Flood Study Existing Conditions (2020) report updates and extends a previous study prepared for Penrith City Council in association with...
-
Flood ProjectFloodplain Risk Management Study and Plan
Karuah River and Stroud Floodplain Risk Management Study
CompletedPublication date: 30/09/2020Study Area The study area comprises the Karuah River valley from Stroud Road to Karuah including the townships of Stroud Road, Stroud, Booral, Allworth, The Branch and Karuah...
-
Flood ProjectConcept Design
Abermain and Weston Flood Warning System - Concept Design (Swamp Creek)
CompletedPublication date: 14/08/2020Investigation and conceptual design of proposed flood warning systems for Swamp Creek at Abermain and Weston
-
Flood ProjectConcept Design
Cessnock Flood Warning System Concept Design (Black Creek)
CompletedPublication date: 14/08/2020Investigation and conceptual design of proposed flood warning systems and infrastructure within areas of highest flood risk in the Cessnock Urban Area
-
Flood ProjectFloodplain Risk Management Study and Plan
Ourimbah Creek Floodplain Risk Management Study & Plan 2019
CompletedPublication date: 31/07/2020Study Objective The report identifies floodplain risk and options to manage the risk. Each option is assessed for effectivness and costed. Catchment Description The Ourimbah...
-
Flood ProjectFlood study
Fairy & Cabbage Tree Creeks Flood Study 2020
CompletedPublication date: 26/06/2020The Fairy & Cabbage Tree Creeks catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council...
-
Flood ProjectFloodplain Risk Management Study and Plan
Ungarie Floodplain Risk Management Study and Plan
CompletedPublication date: 01/06/2020Ungarie has experienced several major historical flood events, including March 2012 and June 2016. To understand and manage flood risk to the town and catchment, council...
-
Flood ProjectFlood study
Eden, Twofold Bay, Towamba River Flood Study
CompletedPublication date: 29/04/2020The Eden, Twofold Bay and Towamba River Flood Study has been prepared for Bega Valley Shire Council to define the existing flood behaviour in the catchment and establish the...
-
Flood ProjectFloodplain Risk Management Study and Plan
South Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 27/04/2020Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...
-
Flood ProjectFloodplain Risk Management Study and Plan
St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan
CompletedPublication date: 23/03/2020Introduction Lyall & Associates has been commissioned to prepare the St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Penrith CBD Floodplain Risk Management Study and Plan
CompletedPublication date: 23/03/2020Introduction Molino Stewart has been commissioned to prepare the Penrith CBD Floodplain Risk Management Study and Plan (FRMS&P) on behalf of Penrith City Council (Council)...
-
Flood ProjectConcept Design
Sutton Stormwater Network Upgrade Scheme Concept Design Report
CompletedPublication date: 01/03/2020This report sets out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Sutton...
-
Flood ProjectConcept Design
Gundaroo Detention Basin Scheme Concept Design Report
CompletedPublication date: 01/03/2020This report sets out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Gundaroo...
-
Flood ProjectFloodplain Risk Management Study and Plan
Louth Flood Study and Floodplain Risk Management Study & PLan
CompletedPublication date: 01/03/2020Study Objectives Bourke Shire Council (Council) commissioned the preparation of the Louth Flood Study (Flood Study) and the Floodplain Risk Management Study and Plan for the...
-
Flood ProjectConcept Design
Northern Central Coast Flood Gauging Network Audit
CompletedPublication date: 14/02/2020This report audited the 31 rainfall and 22 water level gauges in operation in the study region. Study Objective The overall objective of the project was to investigate...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lake Macquarie City Flood Studies & Floodplain Risk Management Studies/Plans
CompletedPublication date: 11/02/2020Map displaying the extents of flood studies, floodplain risk management studies/plans, and the years of their completion.