Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

breadcrumb banner

1,326 Flood Projects found

Filter Results
  • Flood Project
    Concept Design

    Abermain and Weston Flood Warning System - Concept Design (Swamp Creek)

    Completed
    Publication date: 14/08/2020
    Investigation and conceptual design of proposed flood warning systems for Swamp Creek at Abermain and Weston

  • Flood Project
    Concept Design

    Cessnock Flood Warning System Concept Design (Black Creek)

    Completed
    Publication date: 14/08/2020
    Investigation and conceptual design of proposed flood warning systems and infrastructure within areas of highest flood risk in the Cessnock Urban Area

  • Flood Project
    Floodplain Risk Management Study and Plan

    Ourimbah Creek Floodplain Risk Management Study & Plan 2019

    Completed
    Publication date: 31/07/2020
    Study Objective The report identifies floodplain risk and options to manage the risk. Each option is assessed for effectivness and costed. Catchment Description The Ourimbah...

  • Flood Project
    Flood study

    Fairy & Cabbage Tree Creeks Flood Study 2020

    Completed
    Publication date: 26/06/2020
    The Fairy & Cabbage Tree Creeks catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council...

  • Flood Project
    Flood study

    Eden, Twofold Bay, Towamba River Flood Study

    Completed
    Publication date: 29/04/2020
    The Eden, Twofold Bay and Towamba River Flood Study has been prepared for Bega Valley Shire Council to define the existing flood behaviour in the catchment and establish the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    South Creek Floodplain Risk Management Study and Plan

    Completed
    Publication date: 27/04/2020
    Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan

    Completed
    Publication date: 23/03/2020
    Introduction Lyall & Associates has been commissioned to prepare the St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Penrith CBD Floodplain Risk Management Study and Plan

    Completed
    Publication date: 23/03/2020
    Introduction Molino Stewart has been commissioned to prepare the Penrith CBD Floodplain Risk Management Study and Plan (FRMS&P) on behalf of Penrith City Council (Council)...

  • Flood Project
    Concept Design

    Sutton Stormwater Network Upgrade Scheme Concept Design Report

    Completed
    Publication date: 01/03/2020
    This report sets out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Sutton...

  • Flood Project
    Concept Design

    Gundaroo Detention Basin Scheme Concept Design Report

    Completed
    Publication date: 01/03/2020
    This report sets out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Gundaroo...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Louth Flood Study and Floodplain Risk Management Study & PLan

    Completed
    Publication date: 01/03/2020
    Study Objectives Bourke Shire Council (Council) commissioned the preparation of the Louth Flood Study (Flood Study) and the Floodplain Risk Management Study and Plan for the...

  • Flood Project
    Concept Design

    Northern Central Coast Flood Gauging Network Audit

    Completed
    Publication date: 14/02/2020
    This report audited the 31 rainfall and 22 water level gauges in operation in the study region. Study Objective The overall objective of the project was to investigate...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lake Macquarie City Flood Studies & Floodplain Risk Management Studies/Plans

    Completed
    Publication date: 11/02/2020
    Map displaying the extents of flood studies, floodplain risk management studies/plans, and the years of their completion.

  • Flood Project
    Floodplain Risk Management Study and Plan

    Wyong River Catchment Floodplain Risk Management Study & Plan

    Completed
    Publication date: 20/01/2020
    The Wyong River catchment is located on the Central Coast of New South Wales and occupies a total area of 440 km2. The catchment is drained by a network of rivers and creeks...

  • Flood Project
    Flood study

    2D Stormwater Modelling Study Swansea

    Completed
    Publication date: 31/12/2019
    Study Area The Swansea study area lies on the south side of the Swansea Channel which provides the entrance of Lake Macquarie to the Pacific Ocean. The study area has a...

  • Flood Project
    Flood study

    Lake Illawarra, Mt Warrigal and Oak Flats Flood Study

    Completed
    Publication date: 23/12/2019
    The Lake Illawarra, Mt Warrigal and Oak Flats Flood Study has been prepared for Shellharbour City Council (Council) to define the existing flood behaviour in the Lake Illawarra,...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Nattai Ponds Floodplain Risk Management Study & Draft Plan

    Completed
    Publication date: 11/12/2019
    Evaluates a range of options for better managing the flood risk across the Nattai Ponds catchment

  • Flood Project
    Flood study

    Allans Creek Flood Study 2019

    Completed
    Publication date: 11/12/2019
    The Allans Creek catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council engaged Advisian (part...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Wee Waa Levee Risk Management Study & Plan

    Completed
    Publication date: 01/12/2019
    Study Objectives Narrabri Shire Council commissioned the Levee Risk Management Study and Plan for the township of Wee Waa. The overall objectives of the Levee Risk Management...

  • Flood Project
    Flood study

    TOWRADGI CREEK FLOOD STUDY December 2019

    Completed
    Publication date: 01/12/2019
    Towradgi Creek is located within the Wollongong City Council Local Government Area (LGA) and the 7.5km2 catchment incorporates the northern Wollongong suburbs of Tarrawanna,...